This is absolutely the single most important thing to do....

> In addition, bringing all lines into the station (including AC mains
> power, telco, LAN as well as antennas, rotor cables and control lines)
> through a single point grounding panel which has protective devices
> installed on each and every line,

I would also pay attention to what Jim Brown said about the pin 1 problem. 
That is at the very top of important things to worry about.

http://www.w8ji.com/station_ground.htm

Pete, being on the second floor, has some additional wiring "tricks" he must 
do.

73 Tom


______________________________________________________________
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:[email protected]

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html

Reply via email to