branch: externals/org
commit e06821a8f9c14bba3a6475cf495b5fb84ee92e88
Author: Jacob S. Gordon <[email protected]>
Commit: Ihor Radchenko <[email protected]>
org-manual: Generalize documentation of urgency score
* doc/org-manual.org (Sorting of agenda items): Generalize description
of urgency score.
---
doc/org-manual.org | 10 ++++++----
1 file changed, 6 insertions(+), 4 deletions(-)
diff --git a/doc/org-manual.org b/doc/org-manual.org
index 18151212a8..bcb02cba0e 100644
--- a/doc/org-manual.org
+++ b/doc/org-manual.org
@@ -9791,10 +9791,12 @@ done depends on the type of view.
time-of-day specification. These entries are shown at the beginning
of the list, as a /schedule/ for the day. After that, items remain
grouped in categories, in the sequence given by ~org-agenda-files~.
- Within each category, items are sorted by urgency, which is composed
- of the base priority (see [[*Priorities]]; 2000 for priority =A=, 1000
- for =B=, and 0 for =C=), plus additional increments for overdue
- scheduled or deadline items.
+ Within each category, items are sorted by urgency, which is derived
+ from the priority (see [[*Priorities]]), plus additional increments
+ for overdue scheduled or deadline items. The lowest priority is
+ scored as 0, the next as 1000, and continues in steps of 1000 until
+ reaching the highest priority, e.g., =C=, =B=, =A= are scored as 0,
+ 1000, and 2000, respectively.
- For the TODO list, items remain in the order of categories, but
within each category, sorting takes place according to urgency. The