Here is a brief summary of a public VCCI meeting that was held in Santa
Clara, California on March 17, 1997, which I attended.
Five VCCI officials from Japan made presentaions to the audience
relative to the changes in their VCCI standards that become effective
April 1, 1997. They provided a draft copy of the revised standards and
then proceeded to highlight all of the changes made. The VCCI informed
the audience that the final versions of the revised standards will be
distributed by VCCI sometime in late April (but they said the new
standards still become effective April 1). The affected standards are
listed below:
1. V-2/97.04 Regulations for Voluntary Control Measures
2. V-3/97.04 Technical Requirements
3. V-4/97.04 Guidelines for Test Conditions for Equipment under Test
4. V-4/97.04 Appendix II: Test Site Evaulation using Shortened Dipole
5. Misc Forms Application Procedures for Registration of Measurement
Facilities
These draft revised standards were issued by:
VCCI
Shiba-koen Sanada Bldg 2nd Floor
5-12 Shiba-koen 3-chome, Minato-ku, Tokoyo 105
Tel: 03-3434-8809
Fax: 03-3434-8837
http://www.vcci.or.jp/vcci/
Hope this is helpful.
Sincerely,
Manny Barron
Tandem Computers, Inc.
------------ ORIGINAL ATTACHMENT --------
SENT 04-05-97 FROM SMTPGATE @MAILMN ([email protected])
It s in their AGREEMENT OF VCCI FOR ITE document V-2/96.03..Beware though
- I understand that they are revising this agreement AGAIN - I'll keep you
posted.
Charles Grasso
EMC Engineer
StorageTek
----------
From: Arthur Poolton (MEPCD)[SMTP:[email protected]]
Sent: Friday, April 04, 1997 6:54 AM
To: Grasso, Charles (Chaz); 'EMC Group'
Subject: RE: VCCI labelling
Does anyone have samples of the "new" label ?
>----------
>From: Grasso, Charles (Chaz)[SMTP:[email protected]]
>Sent: 04 April 1997 01:06
>To: 'EMC Group'
>Subject: VCCI labelling
>
>I noticed that the VCCI have changed their labelling requirements for
ITE.
>
>How long before we have to use the new label? We still have a lot of the
old
>label.
>