I believe that this question is too general. In general, I would not feel comfortable not doing 100% dielectric testing, but you must look at your particular construction to figure this out. For instance, refer to table 6A concerning insulation in printed boards. Most cases require 100%, or Routine electrical strength testing. Other questions to ask..
Are you relying on reduced clearances (see annex R)? Are your barrier components approved? Are you bridging your barriers in a manner that may affect compliance? Hope this helps, Mel Pedersen Midcom, Inc. Homologations Engineer Phone: (605) 882-8535 [email protected] Fax: (605) 886-6752 ---------- From: Scott Douglas[SMTP:[email protected]] Sent: Friday, April 17, 1998 9:14 AM To: [email protected] Subject: Fwd: Re: Testing of series produced machines Keith asks an excellent question. We make ITE and therefore use EN 60950. We have always been required by TUV to do dielectric strength and ground continuity tests on 100% of production systems. I believe that was because we put GS marks on the systems. We do not GS mark anything any longer. Are we still required to do the tests in order to self-declare and apply the CE marking? Regards, Scott [email protected] [email protected],Internet writes: >Regarding the Machinery Directive..... > >In series production of machines, must each unit be tested for >"continuity of the protective bonding circuit", "insulation resistance >test" and "High voltage test" (these are in 60204 section 20) before the >CE mark can be applied. > >OR > >Can one unit be tested with the information be placed in the Technical >File. > >Thank you for your comments in advance. > > Keith L. Nicholas > Manager, Electrical Controls > AMP Incorporated, Automachine Systems Group > Mail Stop: 161-39 > * (717) 810-2601 > * (717) 810-2443 > * [email protected] > >

