There's a basic summary at http://www.conformance.co.uk/CE_MARKING/ce_pressure.html
although 'basic' is the operative word. I will be updating this in the next few weeks (other commitments permitting!) Key thing you need to know are: *it doesn't come into force until the end of November this year so you can't CE mark under it until then; * conformity assessment is based on a categorisation system which starts with self certification at its simplest and goes right through to fully accredited production control with design verification; * categorisation of vessels (etc.) is based on the operational pressure, the volume and the type of fluid contained. It's among the most complex of all the CE mark directives and you will need to obtain a copy of the full text, including the categorisation charts, to be able to make any sense of it. There are currently no harmonised standards (which is not to say there are no relevant standards). I can provide more info (including a free booklet from the UK government) if you'd like to contact me direct. Regards Nick. At 13:26 -0400 28/5/99, [email protected] wrote: > A bit off the beaten path but maybe someone can interpret for me the >basics of >the Pressure Equipment directive 97/23/EC. For something to have to conform >to it's requirements it needs to have a maximum allowable pressure greater >than >0.5 bar... Is there also a requirement for the volume as well as with the >Simple Pressure Vessel directive? Thanks for any help or a point in the right >direction > > >Regards, > > Lisa > > > --------- This message is coming from the emc-pstc discussion list. To cancel your subscription, send mail to [email protected] with the single line: "unsubscribe emc-pstc" (without the quotes). For help, send mail to [email protected], [email protected], [email protected], or [email protected] (the list administrators).

