The IEC61000-4-11 Standard tests the Hold-up time of the power supply.
The IEC61000-4-14 Standard (I believe)  introduces a disturbance into
the AC mains.
 ----------
From: [email protected]
To: [email protected]
Subject: IEC61000-4-11 versus IEC61000-4-14
List-Post: [email protected]
Date: Friday, April 09, 1999 2:02PM

What is the difference between the IEC61000-4-11 and -14 standards?  Is
one
more stringent than the other?

The descriptions from the IEC web page sound similar:
 -------
IEC 61000-4-11 (1994-06)
Electromagnetic compatibility (EMC) - Part 4: Testing and measuring
techniques
 - Section 11: Voltage dips, short interruptions and voltage variations
immunity
tests
This standard defines the immunity test methods and range of preferred
test
levels for electrical and electronic equipment connected to low voltage
power
supply networks for voltages dips, short interruptions, and voltage
variations.
It applies to electrical and electronic equipment having a rated input
current
not exceeding 16 A per phase. It does not apply to electrical and
electronic
equipment for connection to d.c. networks or 400 Hz a.c. networks.
 -------
IEC 61000-4-14 (1999-02)
Electromagnetic compatibility (EMC) - Part 4-14: Testing and measurement
techniques - Voltage fluctuation immunity test

Applies to electrical and/or electronic equipment that have a rated
input
current up to 16 A per phase. Aims to establish a reference for
evaluating the
immunity of electric and/or electronic equipment when subjected to
positive and
negative low amplitude voltage fluctuations. Only conducted phenomena
are
considered, including immunity tests for equipment connected to public
and
industrial power supply networks.
Has the status of a Basic EMC publication.
 -------
 --
Patrick Lawler
[email protected]

 ---------
This message is coming from the emc-pstc discussion list.
To cancel your subscription, send mail to [email protected]
with the single line: "unsubscribe emc-pstc" (without the
quotes).  For help, send mail to [email protected],
[email protected], [email protected], or
[email protected] (the list administrators).


---------
This message is coming from the emc-pstc discussion list.
To cancel your subscription, send mail to [email protected]
with the single line: "unsubscribe emc-pstc" (without the
quotes).  For help, send mail to [email protected],
[email protected], [email protected], or
[email protected] (the list administrators).

Reply via email to