<< On the subject of TCF and waiving tests, lets say you were to waive a test
 because its non-applicable.  For instance, line conducted when the unit is
 battery powered.  Does this mean that you are required to go the TCF route? 
>>

No.

The TCF route to compliance usually means that you don't use Standards 
(usually because the equipment won't meet them), so there are no tests to 
waive.  The TCF has to describe the equipment in such terms that the 
Competent Body will take responsibility for it's declared EMC performance, 
and that the EMC characteristics are minimized.  This invariably means 
testing, but not to a particular standard.

To go the Standards Route to Compliance,  if a test is not applicable or 
relevant, then simply say so in your technical files which support your Self 
Declaration.  Note that the term 'technical files' is NOT the same thing as a 
Technical Construction File - which is a reserved term described in the UK 
Regulations, Part V, clause 43.

Chris Dupres
Surrey, UK.

-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

To cancel your subscription, send mail to:
     [email protected]
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Jim Bacher:              [email protected]
     Michael Garretson:        [email protected]

For policy questions, send mail to:
     Richard Nute:           [email protected]

Reply via email to