You need to concern yourself with how may shelves to 
install in a rack only if you are responsible for the 
rack and its contents. If your responsibility is limited 
to the shelf, don't worry about the rack. Test rack with
your shelf only - at top half. 

For rack concerns, I only populate racks at 50% load to 
test, if the shelves are of identical type.  My experience 
has shown that if you are going to have any problems with 
emissions or emissions margins, you will see this at half 
rack with identical shelves. Anything beyond this would not 
be cost effective.  

However, if the shelves are of different type, you MUST 
test at full rack. 

Regards,

Bandele 
Jetstream Communications, Inc.
[email protected]

-----Original Message-----
From: [email protected] [mailto:[email protected]]
Sent: Tuesday, July 25, 2000 1:33 PM
To: [email protected]; [email protected]; [email protected]
Cc: [email protected]
Subject: Re: Rack populating??-Rationalize it !!



Methinks I must protest against the "keep adding  until no more
than xdB".
As near as I can tell that was put in place by the FCC and others to
minimize
cable bundles - I cannot see how that applies to rack systems. The 
fundamental 
truth is that - no matter how one rationalizes it - if the full system is
not
tested then you flat have no idea what the real emissions profile is.

Come on stop rationalizing - admit that there will be systems in the field 
that
fail - and move on. This is a byproduct of volume vs test. The higher the 
volume
the more rationalization takes place (witness the Class B procedures) until
the emissions standards will be rendered irrelevant.

-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

To cancel your subscription, send mail to:
     [email protected]
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Jim Bacher:              [email protected]
     Michael Garretson:        [email protected]

For policy questions, send mail to:
     Richard Nute:           [email protected]


-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

To cancel your subscription, send mail to:
     [email protected]
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Jim Bacher:              [email protected]
     Michael Garretson:        [email protected]

For policy questions, send mail to:
     Richard Nute:           [email protected]

Reply via email to