I was reviewing the voltage dip/interrupt requirements of BS
EN61000-6-2:1999, and noticed that one test condition is a 60% dip for 5
periods (0.1s at 50 Hz), while another is 60% for 50 periods (1s at 50Hz).
Both tests require Performance Criteria C.

- Wouldn't a single test at 50 periods cover this requirement?
- Is there a special operating condition or situation intended for this
test that isn't mentioned in the standard?

-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

To cancel your subscription, send mail to:
     [email protected]
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Jim Bacher:              [email protected]
     Michael Garretson:        [email protected]

For policy questions, send mail to:
     Richard Nute:           [email protected]

Reply via email to