Now I am really confused!! As I understand it the EMC Directive was never
intended to
INSTRUCT folks what tests to run or indeed what levels etc..to demonstrate
compliance.
 
Indeed one of the statements from the SLIM was the Directive per se was just
fine
and that the standards etc were the real problem area.
 
 Are these messages referring to the Guidelines in meeting the EMC
Directive?
 
Has the Directive really changed?

-----Original Message-----
From: George Sparacino [mailto:[email protected]]
Sent: Thursday, March 30, 2000 12:09 PM
To: [email protected]
Subject: RE: EMC Directive revisions


Gentlemen..where does one get a copy of the draft for review ?

-----Original Message-----
From: John Juhasz [mailto:[email protected]]
Sent: Thursday, March 30, 2000 9:19 AM
To: '[email protected]'; [email protected]
Subject: RE: EMC Directive revisions



Here we go . . . 'indirect' trade barrier . . . forget Class A. 

To whom can we directly raise our concerns (besides product trade
associations)? 

John Juhasz 
Fiebr Options 
Bohemia, NY 

-----Original Message----- 
From: [email protected] [ mailto:[email protected]
<mailto:[email protected]> ] 
Sent: Thursday, March 30, 2000 7:39 AM 
To: [email protected] 
Subject: RE: EMC Directive revisions 



Thanks Brian. I have some very serious concerns about this draft. 

Art 3A, 1a: "General" type products appear to have to be able to function in

any EMC environment including industrial. Class A type products just went 
out the window since the product must also be able to function in a 
residential environment. 

Annex II, A1,1: Testing immunity to DC current or voltage on AC 
networks???????? 

Annex II, B.1: Oh great! Now we have to design so emissions are "reduced as 
far as possible." 
 I can just see now that we ship every system is a sealed, welded steel 
container. 

Annex II B.1.1: and B.2.1: If a standard lists several levels of emissions 
and immunity, the product must comply with the most severe limits. They have

to be kidding! 

If this is the outcome of SLIM, I would hate to see the outcome of FAT! 

Richard Woods 

        ---------- 
        From:  Brian Jones [SMTP:[email protected]] 
        Sent:  Thursday, March 30, 2000 4:06 AM 
        To:  EMC-PSTC 
        Subject:  Re: EMC Directive revisions 


        Ed, Richard, and everyone 

        Following discussions in the SLIM working group, the Commission has 
now 
        produced a draft of the revised EMC Directive.  This is a complete 
rewrite, 
        not an amendment.  The major change is removal of the requirement 
for fixed 
        installations to be assessed and CE marked prior to taking into 
service, but 
        the possibility for investigation by enforcement authorities, should

        interference be caused, remains.  The distinction between "systems" 
which 
        continue to require CE marking, and "fixed installations" is unclear

at 
        present. 

        It is expected that the draft will undergo further development and 
changes 
        at SLIM working group meetings during this year before a draft is 
published 
        for comment. 

        I will be presenting a paper in one of the poster sessions at the 
EMC 
        Symposium in Washington DC, on the latest position. 

        Best wishes 

        Brian Jones 
        EMC Consultant and Competent Body Signatory 


        ------------------------------------------- 
        This message is from the IEEE EMC Society Product Safety 
        Technical Committee emc-pstc discussion list. 

        To cancel your subscription, send mail to: 
             [email protected] 
        with the single line: 
             unsubscribe emc-pstc 

        For help, send mail to the list administrators: 
             Jim Bacher:              [email protected] 
             Michael Garretson:        [email protected] 

        For policy questions, send mail to: 
             Richard Nute:           [email protected] 
        

------------------------------------------- 
This message is from the IEEE EMC Society Product Safety 
Technical Committee emc-pstc discussion list. 

To cancel your subscription, send mail to: 
     [email protected] 
with the single line: 
     unsubscribe emc-pstc 

For help, send mail to the list administrators: 
     Jim Bacher:              [email protected] 
     Michael Garretson:        [email protected] 

For policy questions, send mail to: 
     Richard Nute:           [email protected] 


-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

To cancel your subscription, send mail to:
     [email protected]
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Jim Bacher:              [email protected]
     Michael Garretson:        [email protected]

For policy questions, send mail to:
     Richard Nute:           [email protected]

Reply via email to