Hello group, I have a product that uses optional 1/2" half-shear electrical knock outs for conduit connections. Can anyone direct me to specific requirements on how much or how little force is required to remove these knock outs? Is a tool required or not if it only pushes outward?
thanks, -doug ================================= Douglas E. Powell Regulatory Compliance Engineer Advanced Energy Industries, Inc. 1625 Sharp Point Dr. Ft. Collins, Co 80525 mailto:[email protected] www.advanced-energy.com ================================= ------------------------------------------- This message is from the IEEE EMC Society Product Safety Technical Committee emc-pstc discussion list. Visit our web site at: http://www.ewh.ieee.org/soc/emcs/pstc/ To cancel your subscription, send mail to: [email protected] with the single line: unsubscribe emc-pstc For help, send mail to the list administrators: Michael Garretson: [email protected] Dave Heald [email protected] For policy questions, send mail to: Richard Nute: [email protected] Jim Bacher: [email protected] All emc-pstc postings are archived and searchable on the web at: http://www.rcic.com/ click on "Virtual Conference Hall,"

