I use AC when it's required by standard. I also have used it on simple devices
such as transformers. However I have changed some large SMPS transformers back
to DC testing due to the high capacitive current load on the tester.

A number of years ago I changed the routine test from AC to DC on switch mode
power supplies. The increased first pass yield demomonstrated that the 60Hz
Dielectric test was causing failures in about 1-2% of the units tested.
Your results will depend upon how well you can control the displacement currents
during the test.

John Merrill
Schneider Automation




-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

To cancel your subscription, send mail to:
     [email protected]
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Jim Bacher:              [email protected]
     Michael Garretson:        [email protected]

For policy questions, send mail to:
     Richard Nute:           [email protected]

Reply via email to