In a message dated 6/7/2002 5:01:43 PM Central Daylight Time, [email protected] writes:
> If the EN 55024 calls for 1,2 kV for surge on the AC, > does this mean we have to repeat the test @ .5, 1kV > too? For ESD, 8 air, 4 cont should really be 8,6,4,2 > air and 4,2,1 cont?? > This is indeed the case. When assessing EMC labs, if evidence did not exist this was being done, at least for transient tests, I would write a deficiency. Further, For tests such as surge, I expect to see synchronization with the both zero crossing points, not just the voltage transition from positive to negative..... I have seen many failures at lower levels that do not show themselves at higher levels. Derek N. Walton Owner, L. F. Research EMC Design and Test Facility 12790 Route 76, Poplar Grove, IL 61065 www.lfresearch.com