I'm lost and looking for just a quick sanity check. We normally don't
need to comply with these specifications so I don't yet have the underlying
standards IEC60068-2-14 method Nb, for example.
Table 5 of the ETSI test spec for air temperature says for air/air
Test Severity is -40/+30 and a 1C/min change.
The duration says 5 cycles T1 = 3h
Assuming by cycle they mean up and back that only accounts for 140
minutes out of the 210 minutes in the 3 hour test cycle. Are they trying to
tell me that there is a dwell time and teach level, of about 35 minutes each.
That at least accounts for the missing 70 minutes?
Gary
-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.
Visit our web site at: http://www.ewh.ieee.org/soc/emcs/pstc/
To cancel your subscription, send mail to:
[email protected]
with the single line:
unsubscribe emc-pstc
For help, send mail to the list administrators:
Ron Pickard: [email protected]
Dave Heald: [email protected]
For policy questions, send mail to:
Richard Nute: [email protected]
Jim Bacher: [email protected]
All emc-pstc postings are archived and searchable on the web at:
http://ieeepstc.mindcruiser.com/
Click on "browse" and then "emc-pstc mailing list"