All,

Is NRTL marking a mandatory requirement to install a CMTS router in a
cable head end in San Diego?

We have a 48 VDC powered CMTS router which needs to be installed in a
cable operator’s head end in early May.  Although the basic UL
evaluation of the product has been completed without incident, marking
authorization is not expected until late in May after the line filter
vendor has approvals for the line filters.

I have heard that a letter from UL or some other NRTL indicating that
the product is under evaluation and listing the NRTL project number may
be sufficient to install the product.  If San Diego is a municipality
that requires NRTL marking to install an ITE product, can a project
notice letter or other procedure be used to allow early installation of
the ITE product?

Any assistance or information will be appreciated.

Regards,


Matt Campanella

Compliance Engineer
Motorola, Inc.
Broadband Communications Sector
3 Highwood Drive East
Tewksbury, MA 01876

[email protected]



-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

Visit our web site at:  http://www.ewh.ieee.org/soc/emcs/pstc/

To cancel your subscription, send mail to:
     [email protected]
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Ron Pickard:              [email protected]
     Dave Heald:               [email protected]

For policy questions, send mail to:
     Richard Nute:           [email protected]
     Jim Bacher:             [email protected]

All emc-pstc postings are archived and searchable on the web at:
    http://ieeepstc.mindcruiser.com/
    Click on "browse" and then "emc-pstc mailing list"

Reply via email to