Sorry folks, another question.
 
I have an instrument that can operate off 50 Hz or 60 Hz, but needs a step
down transformer to be used on 230 volts.
 
 
So, when performing all the testing, I should have the "typical" transformer
in place? The manufacturer has one available for purchase with the EUT.
 
For surge, EFT, and Conducted emissions I should test at the input to the step
down transformer. Anyone disagree?
 
Cheers,

Derek Walton
L F Research.

Reply via email to