This is a multi-part message in MIME format.
Hi All,
Section 7.2.1.2 step 1 seems to be a method of determining the duty cycle of
the EUT.  This step calls for a diode detector for the measurement.  My quick
research shows this to be a fairly expensive accessory piece of equipment.  I
have a couple of questions.
 
1)  What is the purpose of the diode detector?  Normally I use a direct
connection when measuring duty cycle?
2)  I have tested RLAN products in Europe to this standard before, and the
test house over there simply asked me what my duty cycle was.  They never
measured it.  Is it permissible to show the duty cycle in the form of timing
diagram instead.  The FCC allows this. 
 

 

 

Kind Regards,

 

 

Sam Wismer

Engineering Manager

ACS, Inc.

 

(Tel: (770) 831-8048

ÊFax: (770) 831-8598

:Web:  www.acstestlab.com <http://www.acstestlab.com/> 

* <mailto:*[email protected]> [email protected]

 

 


<<Glacier Bkgrd.jpg>>

Reply via email to