Ian,

The points you make are very valid, providing they are applied intelligently
as John Woodgate has already suggested.
However, if your laboratory meets all the requirements of ISO17025, it would
be but a small step to gain accreditation, which would make your reports
acceptable to product certification bodies and thus reduce your external
costs.

A couple of pedantic points:

1. The quality management system standard is ISO 9001:2000, not ISO
9001:2002.

2. Your company is certified to ISO 9001:2000, not accredited. It is BSI who
are accredited as a certification body. This is a common mistake, but if we
professionals don't get it right, then what chance have we of the rest of
the world getting it right.

Best regards

Neil R. Barker CEng MIEE FSEE MIEEE
Manager
Compliance Engineering
e2v technologies (uk) ltd
106 Waterhouse Lane
Chelmsford
Essex CM1 2QU
UK

Tel: (+44) 1245 453616
Fax: (+44) 1245 453410
Mob: (+44) 7801 723735



From: Gordon,Ian [mailto:[email protected]]
Sent: 17 March 2006 09:12
To: 'Mike Hopkins'; [email protected]
Cc: Tricia Rakiey
Subject: RE: Calibration of test equipment


Mike et al
Our EMC lab is audited annually by TUV to ISO 17025 and the company as a
whole is audited annually by BSI and accredited to ISO 9001:2002.  As we
only do in-house testing the cost/benefit of full UKAS accreditation for the
EMC lab isn't worthwhile.
The concerns regarding calibration are:
1 That we have a quality system in place which ensures equipment is
calibrated using traceable standards. 
2 That we know when any piece of equipment was LAST calibrated and if, when
it NEXT goes for calibration whether it was found to be outside the
manufacturers specification or not. If it is found to be outside the
manufacturers specification then any compliance work performed with that
piece of equipment since the LAST calibration will be repeated. 
Thus the "cal due" date is arbitrary.
It is essential however that you perform checks to ensure the equipment is
still functioning at regular intervals - e.g. on a regular basis I measure
the voltage generated by our transient generator and use a reference source
to ensure our receiver + cables + antenna + room are working. Trend analysis
is also performed.

Ian Gordon

-

This message is from the IEEE Product Safety Engineering Society
emc-pstc discussion list.    Website:  http://www.ieee-pses.org/

To post a message to the list, send your e-mail to [email protected]

Instructions:  http://listserv.ieee.org/request/user-guide.html

List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:

     Scott Douglas           [email protected]
     Mike Cantwell           [email protected]

For policy questions, send mail to:

     Jim Bacher:             [email protected]
     David Heald:            [email protected]

All emc-pstc postings are archived and searchable on the web at:

    http://www.ieeecommunities.org/emc-pstc

Reply via email to