Brian,

You are absolutely correct. It is most difficult to specify the operational
specifications of electronics in regards to transients and other anomalies. 

I deal with engineers of two different schools; one approach is to specify and
document all the requirements, which in most cases is very difficult to do, OR
those who just test and qualify.

I'm a believer in the later (because we live to test, test, test). 

We are blessed by having a corporate compliance lab that can qualify almost any
component or prototype setup in a few days.  Our testing finds a lot of
problems
up front and engineering has come to rely on this testing to insure a compliant
final design. 

Brian


____________________Reply Separator____________________
Subject:    RE: Burst and surge tests
Author: [email protected]
List-Post: [email protected]
Date:       5/18/2006 5:09 PM

Good People

I speak only for myself, and perhaps for my dog, but definitely not for my
cat or employer...

It is difficult for a component SMPS mfr to say that the outputs will stay
within specified tolerance *DURING* these tests; because we cannot control
the ultimate end-use installation.

There are, in fact, some end-use constructions that will probably not be
able to pass either Criterion, for any reasonable-cost SMPS.

luck,
Brian

> -----Original Message-----
> From: [email protected] [mailto:[email protected]]On Behalf Of John
> Woodgate
> Sent: Thursday, May 18, 2006 7:31 AM
> To: [email protected]
> Subject: Re: Burst and surge tests
>
>
> In message <[email protected]>, dated Thu, 18 May 2006,
> [email protected] writes
> >So, we have specified that the output of power supplies must
> not cause
> >our electronics to malfunction during the 4-4 or 4-5 tests.
> We specify
> >that the DC output of a power supply can not go "out of spec" during
> >these tests.
>
> Effectively, you are applying Criterion A instead of B, and indeed
> that's usually very difficult to do. That's why Criterion B exists.
>
> But there may be no other solution if you buy-in the power supply,
> unless you can co-operate with the supplier to agree a less stringent
> requirement that does not result in your own electronics being
> compromised.
> --
> OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk
> 2006 is YMMVI- Your mileage may vary immensely.
>
> John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK

-

This message is from the IEEE Product Safety Engineering Society
emc-pstc discussion list.    Website:  http://www.ieee-pses.org/

To post a message to the list, send your e-mail to [email protected]

Instructions:  http://listserv.ieee.org/request/user-guide.html

List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:

Scott Douglas           [email protected]
Mike Cantwell           [email protected]

For policy questions, send mail to:

Jim Bacher:             [email protected]
David Heald:            [email protected]

All emc-pstc postings are archived and searchable on the web at:

http://www.ieeecommunities.org/emc-pstc

-

This message is from the IEEE Product Safety Engineering Society
emc-pstc discussion list.    Website:  http://www.ieee-pses.org/

To post a message to the list, send your e-mail to [email protected]

Instructions:  http://listserv.ieee.org/request/user-guide.html

List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:

     Scott Douglas           [email protected]
     Mike Cantwell           [email protected]

For policy questions, send mail to:

     Jim Bacher:             [email protected]
     David Heald:            [email protected]

All emc-pstc postings are archived and searchable on the web at:

    http://www.ieeecommunities.org/emc-pstc

Reply via email to