Dear Mr Loerzer,
 
There is no lab in the world that will charge $6000 for a name change. You
must be going through an agent in Germany that is trying make some large
profit; or there is  some problem with communications.
 
 
Peter

"M. Loerzer-Mobile (GLOBALNORM)" <[email protected]> wrote:

Okay. Is the NEC/NFPA 70 applicable for "industrial" sub-assemblies?  I think
"no" because  ANSI/NFPA 79 is applicable (chapter 3 "AHJ", labelled equipment).
 
The big difference for our European manufacturers is the "third party
testing/certification in the US" in comparison to our CE procedure
"presumption of conformity".
 
That causes sometimes problems with some NRTLs. Currently one of our customers
has the problem with a NRTL test lab:
 
This mfr. has a TUV certificate. Currently has the company name changed.
Therefore the TUV lab requires a "new edition of a certificate" for the
renaming and this action should be cost 6000 US $!!!!!!!
 
That is stupid and has no usage regarding "AJH, safe products, ect"!
 
Mit freundlichen Grüßen
Yours sincerely
 
Dipl.-Ing. Michael Loerzer
Managing Director
Regulatory Affairs Specialist
 
Fon: +49 30 3229027-50, Direct Call: -51
Fax: +49 30 3229027-59
 
 <http://www.globalnorm.de/> www.Globalnorm.de 


Globalnorm GmbH, Sitz der Gesellschaft: Alt-Moabit 94, 10559 Berlin
Geschaeftsfuehrer: Dipl.-Ing. Michael Loerzer
Amtsgericht Berlin-Charlottenburg HRB 105204 B, USt-ID-Nummer: DE251654448


----- Original Message ----- 
From: Don Gies <mailto:[email protected]>  
To: 'M. Loerzer-Mobile (GLOBALNORM)' <mailto:[email protected]>  ;
[email protected] 
Sent: Friday, February 16, 2007 10:43 PM
Subject: RE: Industrial Sub-Assembly for the US-market

Michael,
 
Be careful using the word “legal” and thinking only of the federal
government.  I have seen other people make this mistake.  The people that
normally enforce the electrical codes in the United States are the “local”
governments, typically cities, townships, counties, etc.  The electrical
inspection authorities are referred to in the National Electrical Code, NFPA
70 as the “authority having jurisdiction”.  The state governments adopt
the National Electrical Code, with or without their deviations, as their own
after every 3-year code cycle.  Some municipalities, such as Los Angeles, have
their own electrical code that is not a derivative of NFPA 70, but essentially
all municipalities share the code requirement that “conductors and equipment
required or permitted by this Code shall be acceptable only if approved”
(NFPA 70-110.2).
 
The code says in so many places that equipment does not have to be re-examined
at the installation site if it is listed by a qualified lab.  To keep this
message brief, the qualified labs are the Nationally Recognized Testing
Laboratories (NRTLs) determined by the Occupational Safety and Health
Administration (OSHA).  In most parts of the code, it says specifically that
the equipment or wiring means must be “listed”.
 
In addition, OSHA Rules Part 1900-Subpart S has requirements for equipment
used in the workplace to be listed by an NRTL.  That, of course, is at the
federal government level.
 
Best Regards,
 
Don Gies, N.C.E
Senior Product Compliance Engineer
Alcatel-Lucent
Holmdel, NJ 07733 USA
 

  _____  

From: M. Loerzer-Mobile (GLOBALNORM) [mailto:[email protected]] 
Sent: Friday, February 16, 2007 3:26 PM
To: [email protected]
Subject: Re: Industrial Sub-Assembly for the US-market
 
Mike, David,
 
Two different answers or not?!
 
David said:

  _____  

Correct.  Mfr of the machine is responsible for appovals.  There is no customs
requirement.
 
But if the subassembly is a power supply to be incorporated into an
NRTL-approved unit, a UL or TÜV recognition mark (backwards 'UR', 'bauart')
facilitates approval.
 
David

  _____  

My "new understanding": Some OSHA regulations e. g. 29 CFR Part 1910 Subpart S
(Electrical) requires "NRTL approved equipment" BUT in my view that is a
OBLIGATION (legal requirement) for the EMPLOYER (safety at the workplace for
the exposed worker) not for the manufacturer!
 
Surely: a customer (employer) will only buy a machine or equipment which is
safe. Therefore he will accept (buy) only a machine which is NRTL accepted but
that is not a legal requirement for the manufacturer, isn´t it?
 
Another question for "industrial products": Are "industrial
equipments/sub-assemblies like electrical safe guards, power drive systems,
motors, control system" covered by FCC Part 15?
 
Mit freundlichen Grüßen
Yours sincerely
 
Dipl.-Ing. Michael Loerzer
Managing Director
Regulatory Affairs Specialist
 
Fon: +49 30 3229027-50, Direct Call: -51
Fax: +49 30 3229027-59
 
 <http://www.globalnorm.de/> www.Globalnorm.de 


Globalnorm GmbH, Sitz der Gesellschaft: Alt-Moabit 94, 10559 Berlin
Geschaeftsfuehrer: Dipl.-Ing. Michael Loerzer
Amtsgericht Berlin-Charlottenburg HRB 105204 B, USt-ID-Nummer: DE251654448

----- Original Message ----- 
From: Mike Mertinooke <mailto:[email protected]>  
To: M. Loerzer-Mobile (GLOBALNORM) <mailto:[email protected]>  
Sent: Friday, February 16, 2007 9:21 PM
Subject: Re: Industrial Sub-Assembly for the US-market
 
Hi Michael;

Your understanding is not correct. There are MANY US
requirements. The complete list can only be determined
>from the construction of the assembly and the
environment in which it is used. Also, the state to which
it is being shipped, and in some cases the states through
which it will pass while being transported.

Every state has its own regulations (example: California
has many regulations that are completely unique).

Also, every county and city has its own regulations
(example: New York and Los Angeles have very
extensive regulations that are unique).

Next, OSHA becomes involved if the assembly is
to be installed in a workplace.

Finally, the industry or the customer itself may have
many regulations (example: General Electric,
General Motors, Ford, etc. all have very extensive
regulations of their own).

UL, CSAUS, ETL, and any other NRTL mark may or
may not be required. It all depends on the above.
Finally,  your own business decision might be to
use NRTL approval even when it is not required.

Remember, when you sell in the USA, you *WILL*
be sued by your customers. They will try to steal
all your money. This is how business works in USA.
Your *ONLY* defense is NRTL certification. And
even that is not a very good protection.

Good luck.

Mike Mertinooke




M. Loerzer-Mobile (GLOBALNORM) wrote:
> Hi All,
>
> in my understanding an industrial sub-assembly which is intended for a
machinery no mandatory US requirements do exist, don´t it?
>
> Also a "UL mark" isn´t required because the UL mark isn´t a "legal mark"
(like the European CE marking).
>
> Is that correct? Comments are welcome.
>
> Mit freundlichen Grüßen
> Yours sincerely
>
> Dipl.-Ing. Michael Loerzer
> Managing Director
> Regulatory Affairs Specialist
>
> Fon: +49 30 3229027-50, Direct Call: -51
> Fax: +49 30 3229027-59
>
> www.Globalnorm.de <http://www.globalnorm.de/>  
> -------------------------------------

> Globalnorm GmbH, Sitz der Gesellschaft: Alt-Moabit 94, 10559 Berlin
> Geschaeftsfuehrer: Dipl.-Ing. Michael Loerzer
> Amtsgericht Berlin-Charlottenburg HRB 105204 B, USt-ID-Nummer: DE251654448
>
> -
> ----------------------------------------------------------------
> This message is from the IEEE Product Safety Engineering Society
> emc-pstc discussion list.    Website:  http://www.ieee-pses.org/
>
> To post a message to the list, send your e-mail to [email protected]
>
> Instructions:  http://listserv.ieee.org/request/user-guide.html
>
> List rules: http://www.ieee-pses.org/listrules.html
>
> For help, send mail to the list administrators:
>
>      Scott Douglas           [email protected]
>      Mike Cantwell           [email protected]
>
> For policy questions, send mail to:
>
>      Jim Bacher:             [email protected]
>      David Heald:            [email protected]
>
> All emc-pstc postings are archived and searchable on the web at:
>
>     http://www.ieeecommunities.org/emc-pstc
>
>   

- ---------------------------------------------------------------- This
message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. Website: http://www.ieee-pses.org/ 
To post a message to the list, send your e-mail to [email protected] 
Instructions: http://listserv.ieee.org/request/user-guide.html 
List rules: http://www.ieee-pses.org/listrules.html 
For help, send mail to the list administrators: 
Scott Douglas [email protected] Mike Cantwell [email protected] 
For policy questions, send mail to: 
Jim Bacher: [email protected] David Heald: [email protected] 
All emc-pstc postings are archived and searchable on the web at: 
http://www.ieeecommunities.org/emc-pstc -
---------------------------------------------------------------- This message
is from the IEEE Product Safety Engineering Society emc-pstc discussion list.
Website: http://www.ieee-pses.org/ 
To post a message to the list, send your e-mail to [email protected] 
Instructions: http://listserv.ieee.org/request/user-guide.html 
List rules: http://www.ieee-pses.org/listrules.html 
For help, send mail to the list administrators: 
Scott Douglas [email protected] Mike Cantwell [email protected] 
For policy questions, send mail to: 
Jim Bacher: [email protected] David Heald: [email protected] 
All emc-pstc postings are archived and searchable on the web at: 
http://www.ieeecommunities.org/emc-pstc
- ---------------------------------------------------------------- This
message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. Website: http://www.ieee-pses.org/ 
To post a message to the list, send your e-mail to [email protected] 
Instructions: http://listserv.ieee.org/request/user-guide.html 
List rules: http://www.ieee-pses.org/listrules.html 
For help, send mail to the list administrators: 
Scott Douglas [email protected] Mike Cantwell [email protected] 
For policy questions, send mail to: 
Jim Bacher: [email protected] David Heald: [email protected] 
All emc-pstc postings are archived and searchable on the web at: 
http://www.ieeecommunities.org/emc-pstc 




  _____  

Never miss an email again! <http://us.r
.yahoo.com/evt=49938/*http://tools.search.yahoo.com/toolbar/features/mail/> 
Yahoo! Toolbar alerts you the instant new Mail arrives. Check it out.
<http://us.rd.yahoo.com/evt=49937/*http
//tools.search.yahoo.com/toolbar/features/mail/>  -
---------------------------------------------------------------- This message
is from the IEEE Product Safety Engineering Society emc-pstc discussion list.
Website: http://www.ieee-pses.org/ 

To post a message to the list, send your e-mail to [email protected] 


Instructions: http://listserv.ieee.org/request/user-guide.html 


List rules: http://www.ieee-pses.org/listrules.html 


For help, send mail to the list administrators: 


Scott Douglas [email protected] Mike Cantwell [email protected] 


For policy questions, send mail to: 


Jim Bacher: [email protected] David Heald: [email protected] 


All emc-pstc postings are archived and searchable on the web at: 


http://www.ieeecommunities.org/emc-pstc 
______________________________________________________________________
This email has been scanned by the MessageLabs Email Security System.
For more information please visit http://www.messagelabs.com/email 
______________________________________________________________________




Reply via email to