For the CISPR 16 1-6GHz radiated emissions site validation procedure, is there
a requirement that the site validation be performed (and pass) with each
antenna that we intend to use to make these measurements? 

We have two of the same model horn. Do I need to make the validation
measurements twice, once with each horn? (If so, then does that imply the
antenna is part of the "site" rather than measurement apparatus?) 

If this is the case, can someone who has more detailed knowledge of the
standards quote me the relevant clause? 

My thanks in advance. 

John D. Flavin 
Teradata TCP Engineering 
17095 Via del Campo 
San Diego, CA 92127 
[email protected] 
V: (858) 485-3874 
F: (213) 337-5432 

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at
http://product-compliance.oc.ieee.org/
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]> 

For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]> 


Reply via email to