For the CISPR 16 1-6GHz radiated emissions site validation procedure, is there a requirement that the site validation be performed (and pass) with each antenna that we intend to use to make these measurements?
We have two of the same model horn. Do I need to make the validation measurements twice, once with each horn? (If so, then does that imply the antenna is part of the "site" rather than measurement apparatus?) If this is the case, can someone who has more detailed knowledge of the standards quote me the relevant clause? My thanks in advance. John D. Flavin Teradata TCP Engineering 17095 Via del Campo San Diego, CA 92127 [email protected] V: (858) 485-3874 F: (213) 337-5432 - ---------------------------------------------------------------- This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to <[email protected]> All emc-pstc postings are archived and searchable on the web at http://product-compliance.oc.ieee.org/ Graphics (in well-used formats), large files, etc. can be posted to that URL. Website: http://www.ieee-pses.org/ Instructions: http://listserv.ieee.org/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Scott Douglas <[email protected]> Mike Cantwell <[email protected]> For policy questions, send mail to: Jim Bacher <[email protected]> David Heald <[email protected]>

