Looks like my library skips past this standard. Does anybody have the
particulars, 5% salt, 35C, wet/dry cycles,  etc for this test.

 

I’m comparing a Mil-810 test with another commercial requirement and I see
the mil test at 2 24 hour cycles, with a 24 hour dry cycle, but the commercial
standard has 144 hours of salt. So I want to see what the IEC has to say about
it.

 

Thanks

 

Gary McInturff

Reliability/Compliance Engineer

Advanced Input Systems

Esterline Corporation

600 West Wilbur Avenue

Coeur d' Alene, Idaho 83815

Tel: 208 635 8306

Fax 208 635 8706

 

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]> 

For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]> 


Reply via email to