Are fixed installation located outside EU required to have Technical 
Documentation in place before shipment? 

As we know that fixed installations are not required to have:
􀂃 An EMC assessment;
􀂃 A conformity assessment;
􀂃 An EC declaration of conformity;
􀂃 The CE marking affixed.

However, 2004/108 does require fixed installations to follow a regime that 
demonstrates compliance with its
Protection Requirements, by:
a) Following the installation and use instructions required to be provided with 
apparatus (see above)
b) Following the installation and use instructions required to be provided with 
equipment that is not
placed on the market and is supplied only to specified fixed installations (see 
later)
c) The application of good EMC engineering practices to the fixed installation, 
having regard to the
state of the art

Regards,
Mel

-

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<[email protected]>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]>

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
David Heald: <[email protected]>

Reply via email to