Are fixed installation located outside EU required to have Technical Documentation in place before shipment?
As we know that fixed installations are not required to have: An EMC assessment; A conformity assessment; An EC declaration of conformity; The CE marking affixed. However, 2004/108 does require fixed installations to follow a regime that demonstrates compliance with its Protection Requirements, by: a) Following the installation and use instructions required to be provided with apparatus (see above) b) Following the installation and use instructions required to be provided with equipment that is not placed on the market and is supplied only to specified fixed installations (see later) c) The application of good EMC engineering practices to the fixed installation, having regard to the state of the art Regards, Mel - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to <[email protected]> All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc Graphics (in well-used formats), large files, etc. can be posted to that URL. Website: http://www.ieee-pses.org/ Instructions: http://listserv.ieee.org/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Scott Douglas <[email protected]> Mike Cantwell <[email protected]> For policy questions, send mail to: Jim Bacher: <[email protected]> David Heald: <[email protected]>

