I am assuming this means that the "Date of cessation of presumption of
conformity of the superseded standard" for both EN 55022:2006 and EN
55022:2006 A1:207 have been pushed back to 1/10/2011 to allow use of EN
55022:1998 + A1:2000 + A2 :2003 until October 2011.

Anyone have any idea as to why they didn’t just extend the date for
implementation of EN 55022 A1:2007, leaving EN 55022:2006 as the interim
standard?

Mark
 
 
________________________________________
From: [email protected] [mailto:[email protected]] 
Sent: Friday, August 21, 2009 2:39 PM
To: Spencer, David H
Cc: [email protected]
Subject: Re: EN55022:1998, +A1:2000, +A2:2003 Extended
You can view the clean PDF of 2009/C 197/03 issued today at the following
web address:
http://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:C:2009:197:0003:000
3:EN:PDF 

Based on the 2009/C 197/03, it appears that manufacturers are granted an
extra year before their products must meet the requirements of
EN55022:2006+A1:2007 which requires testing in 1-6GHz with the 4dB tighter
limits compared to FCC in the frequency range 1-3GHz.  The new deadline is 1
October 2011.  

I haven't heard of any issues about floor-standing equipment.  We have
floor-standing equipment and the testing goes smoothly.  However, every
information technology manufacturer was under a lot of time pressure to test
already released products to the new test methodology and limits --
especially if you have a big product line.  With the limits at 1-3GHz being
4dB tighter than FCC, some products may require fixes or an accelerated
End-of-Life (EOL) decision.  This one year delay gives manufacturers more
time to perform the testing and make those decisions.

I have some related questions:
1.  Will Japan VCCI delay its 1 October 2010 deadline to match Europe?  

2.  Will China CCC delay its 1 March 2011 deadline to still give an extra
five months time after the Europe deadline to go through the in-country test
and bureaucracy effort to update the CCC approvals?  I would hope the 1-6GHz
test requirement would be delayed to at least 1 March 2012.

3.  Will China CCC delay its 1 September 2010 deadline to upgrade CCC
approvals to include the testing of telecommunications ports? 
Unfortunately, if this deadline is not extended, we will still have to rush
to send all our products to China for testing even if the 1-6GHz test
requirement is delayed.

Thanks.
Monrad L. Monsen
Worldwide Compliance Officer
Sun Microsystems
[email protected]

Spencer, David H wrote: 
I'm assuming this has is due to the huge issues with floor standing EUT's
and testing >1GHz. 
Text From OJ.  Aug 21, 2009   
"Commission communication in the framework of the implementation of
Directive 2004/108/EC of the European Parliament and of the Council on the
approximation of the laws of the Member States relating to electromagnetic
compatibility and repealing Directive 89/336/EEC 
(Text with EEA relevance) 
(Publication of titles and references of harmonised standards under this
directive) 
(2009/C 197/03) 
The date of cessation of presumption of conformity for ‘EN 55022:1998
Information technology equipment — Radio disturbance characteristics —
Limits and methods of measurement (CISPR 22:1997 (Modified))’ and its
amendments ‘A1:2000 to EN 55022:1998 (CISPR 22:1997/A1:2000)’ and
‘A2:2003
to EN 55022:1998 (CISPR 22:1997/A2:2002)’ which was set out in the
Commission communication published in the Official Journal of the European
Union C 126 of 5 June 2009, is postponed until 1 October 2011. 
Commission communication in the framework of the implementation of Directive
1999/5/EC of the European Parliament and of the Council on radio equipment
and telecommunications terminal equipment and the mutual recognition of
their conformity 
(Text with EEA relevance) 
(Publication of titles and references of harmonised standards under this
Directive) 
(2009/C 197/04) 
The date of cessation of presumption of conformity for ‘EN 55022:1998
Information technology equipment — Radio disturbance characteristics —
Limits and methods of measurement (CISPR 22:1997 (Modified))’ and its
amendments ‘A1:2000 to EN 55022:1998 (CISPR 22:1997/A1:2000)’ and
‘A2:2003
to EN 55022:1998 (CISPR 22:1997/A2:2002)’ which was set out in the
Commission communication published in the Official Journal of the European
Union C 280 of 4 November 2008, is postponed until 1 October 2011."

Regards, 
David Spencer 
EMC Engineer 
Xerox Corp 
-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that
URL. 
Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 
For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]> 
For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]> 

-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]>

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
David Heald: <[email protected]>

Reply via email to