GR-1089 clause 4.6.9.2 intrabuilding surge test has an exemption for shielded cables grounded at each end. This is supported by Verizon document http://www.verizonnebs.com/TPRs/VZ-TPR-9305.pdf clause 7.2.12.1.
Does this reflect current practice? Thanks in advace, David David Gelfand | Conformity Specialist | Kontron Canada | T 450 437 4661 x2449 |F 450 437 8053 | E [email protected] - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to <[email protected]> All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc Graphics (in well-used formats), large files, etc. can be posted to that URL. Website: http://www.ieee-pses.org/ Instructions: http://listserv.ieee.org/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Scott Douglas <[email protected]> Mike Cantwell <[email protected]> For policy questions, send mail to: Jim Bacher: <[email protected]> David Heald: <[email protected]>

