In message <[email protected]>, dated Tue, 10 Mar 2009, Monrad Monsen <[email protected]> writes:
>Hence, I am looking for guidance in the standards on what the correct >approach is for testing systems with redundant power. Configurations 1 and 3 look sensible to me. Where the supply is multiphase, Config 1 represents a fault affecting one phase only while Config 3 represents a fault affecting two, or the case of a single-phase supply. If no-one from IEC SC77B responds here, you should take this matter up through your TAG. It's an SC77B matter, not CISPR/I, in my opinion. -- OOO - Own Opinions Only. Try www.jmwa.demon.co.uk and www.isce.org.uk Things can always get better. But that's not the only option. John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to <[email protected]> All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc Graphics (in well-used formats), large files, etc. can be posted to that URL. Website: http://www.ieee-pses.org/ Instructions: http://listserv.ieee.org/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Scott Douglas <[email protected]> Mike Cantwell <[email protected]> For policy questions, send mail to: Jim Bacher: <[email protected]> David Heald: <[email protected]>

