In IEC60533 ("Electrical and electronic installation in ships - EMC") there is 
a requirement for conducted emission on Power lines and I/O signal /control 
lines.





In our case, potenial conducted noise on our signal lines have to pass through 
a number of PCBs, DC/DC convertes and AC/DC supply, before the noise will enter 
the ship AC network.



I have a problem to see why we should measure direct on the signal line, 
shouldn't we test on the AC instead?



Best regards

 Amund

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<[email protected]>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]>

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
David Heald: <[email protected]>

Reply via email to