I am looking at re-controlling a machine that has two parallel "X" axes 
- one is called X and the other is U.

The machine consists of two parallel sliding tables beneath a single 
head.   The head is mounted to an overhead Y axis and Z axis.

Only one sliding table is used while cutting a part.  The idea was that 
one table could be loaded with a new part to process while the other 
table was being used to cut a part.

The existing control, an 11 year old Osai control, has the ability to 
switch which between the hardware X and U axis.   The programs are 
written only in terms of X,Y, and Z.

I believe there is a switch on the console to determine which table will 
be used prior to the part program being run.

My question is:  What would be the best way to implement this two "X" 
axis control scheme with EMC2?

Thanks,

Dave



------------------------------------------------------------------------------
Magic Quadrant for Content-Aware Data Loss Prevention
Research study explores the data loss prevention market. Includes in-depth
analysis on the changes within the DLP market, and the criteria used to
evaluate the strengths and weaknesses of these DLP solutions.
http://www.accelacomm.com/jaw/sfnl/114/51385063/
_______________________________________________
Emc-users mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/emc-users

Reply via email to