Hi i think that instead of look ahead for G0 it will be better to have/create new M code (M100 or M(n)) that will: after running on G1 mode and after reading code G0 will move Z up 1" (or some parameter a=..., then move back on the same last trajectory about 0.5" -0.75" or some parameter b=.., then down to initial Z or parameter C=..., and reread last 0.5" =0.75" trajectory motion. this new M code will open new and necessary capability of linux cnc -- for use with welding application. How difficult it will be to create such M code? Any idea direction how to do that?
thank you aram On Sun, Jun 7, 2015 at 3:16 PM, a k <[email protected]> wrote: > hi > i am interesting if it will be possible to Linux cnc look ahead 4-5 lines > before G0 and then send some signal out? > right now i have a working system where when system reads G0 signal going > out. > now i want to this signal went out like 0.5" - 0.75" of travel before > actually system reads G0 > when i said 0.5" - 0.75"---before G0 machine moves on G1 and when > this travel will be around 0.5" - 0.75" before the end of travel i want to > signal that indicates G0 go out. > > thank you > aram > ------------------------------------------------------------------------------ _______________________________________________ Emc-users mailing list [email protected] https://lists.sourceforge.net/lists/listinfo/emc-users
