Hi,

I updated status of the previously listed bugs (see bottom of this e-mail) 
to reflect which should be closed.

I also suggest the following actions for these two:

146439 
2006-10-19 
maj 
P2 
PC 
RESO 
EPF 
Content 
0.9 
1.0.0 
PM - Add new Concept: Project Team 
I think we can skip this. I asked Scott to take on a Guideline for 
Staffing Project based on what he has written for Specializing 
generalists. I think that is enough. I suggest that Staffing Project is 
referenced from each role (how to staff that role), and that we in that 
guideline talks about that you want to avoid having all different people 
taking on different roles, and rather want people to take on several roles 
at the same time, e.g. developer and tester or analyst, developer, and 
tester.
146453 
2006-11-08 
maj 
P2 
PC 
RESO 
EPF 
Content 
0.9 
1.0.0 
PM - Guideline: Assign Work - add content 
I think we can skip this. The above reference guideline for Staffing 
Project is enough.

Cheers

Per Kroll
STSM, Manager Methods: RUP / RMC
Project Lead: Eclipse Process Framework
Rational Software, IBM Corp
(M) 408-219-2963



"Chris Armstrong" <[EMAIL PROTECTED]> 
Sent by: [EMAIL PROTECTED]
11/09/2006 08:05 AM
Please respond to
[EMAIL PROTECTED]; Please respond to
Eclipse Process Framework Project Developers List <[email protected]>


To
"'Eclipse Process Framework Project Developers List'" 
<[email protected]>
cc

Subject
RE: [epf-dev] Resolving open/deferred PM bugs






Seems reasonable to me. I agree that we want to keep it lean and mean... 
Chris ~:|

From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On 
Behalf Of Per Kroll
Sent: Wednesday, November 08, 2006 10:43 AM
To: [email protected]
Subject: [epf-dev] Resolving open/deferred PM bugs


Hi, 

we have 6 deferred PM bugs. Below you find my recommendations for each 
bug. In general, I think we need to keep the process small. Only add stuff 
if it is really crucial. Please  comment. 
Any takers on writing content? 
146439 
2006-10-19 
maj 
P2 
PC 
RESO 
EPF 
Content 
0.9 
1.0.0 
PM - Add new Concept: Project Team 

Suggest closing, never doing. I do not think this is critical. 
146457 
2006-10-19 
maj 
P2 
PC 
RESO 
EPF 
Content 
0.9 
1.0.0 
PM - Guideline: Prioritizing Work - add content
Suggest closing, never doing. I do not think this is critical. 
146461 
2006-10-19 
maj 
P2 
PC 
RESO 
EPF 
Content 
0.9 
1.0.0 
PM - Guideline: Staffing Project - add content 
Keep - Suggest leveraging some content Scott has on generalizing 
specialist. 
146466 
2006-10-19 
maj 
P2 
PC 
RESO 
EPF 
Content 
0.9 
1.0.0 
PM - Guideline: Type and Frequency of Assessments - add c...  - Suggest 
closing, never doing. I do not think this is critical. 

146467 
2006-10-19 
maj 
P2 
PC 
RESO 
EPF 
Content 
0.9 
1.0.0 
PM - Guideline: Types of Metrics - add content 
Suggest closing, never doing. I do not think this is critical. 
146476 
2006-10-19 
maj 
P2 
PC 
RESO 
EPF 
Content 
0.9 
1.0.0 
PM - Concept: Building Effective Teams - add content 
Suggest closing, never doing. I do not think this is critical.


Cheers 

Per Kroll
STSM, Manager Methods: RUP / RMC
Project Lead: Eclipse Process Framework
Rational Software, IBM Corp
(M) 408-219-2963_______________________________________________
epf-dev mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/epf-dev

_______________________________________________
epf-dev mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/epf-dev

Reply via email to