Attendees:

Ricardo

Brian

Jaana

Bruce

Jim

Steve

 

 

The purpose of this tele-con was to determine of the "General and Over
arching" objectives for M6 were realistic and if resources were available
for these activities.

 


158096 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=158096>  

NEW 

1.0 M6 

General - Rework OpenUP Graphic banner 

-        defer to subsequent iteration, requires the service of a graphic
artist.

-         

 


164687 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=164687>  

NEW 

1.0 M6 

General - Add the term "Collaboration" to the glossary 

-        will be done by Steve

-         


173683 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=173683>  

NEW 

1.0 M6 

General - Rename Core Principle "Focus on articulating th... 

-        Jaana to lead this discussion

-         

 


176199 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=176199>  

NEW 

1.0 M6 

General - Create content for Guideline: OpenUP and OpenUP... 

-        assigned to Jim

-         


176200 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=176200>  

NEW 

1.0 M6 

General - Create content for Guideline: Minimal, Complete... 

-        Find out if either Per or Bruce have time to do this.

-         


176201 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=176201>  

NEW 

1.0 M6 

General - Create content for Guideline: Agile and Unified 

-        assigned to Jim

-         


176202 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=176202>  

NEW 

1.0 M6 

General - Create content for Resources for Modifying Methods 

-        assigned to Ricardo

-         


176207 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=176207>  

NEW 

1.0 M6 

General - Create content for Resources for Contributing t... 

-        assigned to Brian

-         


160944 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=160944>  

ASSI 

1.0 M6 

General - Diagram needs hyperlinks 

-        this issue is related to the next one 164686 and requires a
decision regarding work products and the sub-processes. Brian to comment on
this. 

-         


164686 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=164686>  

ASSI 

1.0 M6 

General - Remove Content Describing Subprocesses 


174028 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=174028>  

ASSI 

1.0 M6 

General - Re-organize Disciplines 


176455 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=176455>  

ASSI 

1.0 M6 

General - Create first draft of OpenUP Case Study 

-        assigned to Steve and in progress

-         


176456 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=176456>  

ASSI 

1.0 M6 

General - First draft of case study white paper. 

-        assigned to Steve and in progress.

-         


176835 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=176835>  

ASSI 

1.0 M6 

General - Check OpenUP/Basic content for accessibility 

-        This and the next issue 176835 will require freezing OpenUP for
about three days while the updates are made. Ricardo to keep us informed of
progress.

-         


176836 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=176836>  

ASSI 

1.0 M6 

General - Check OpenUP/Basic content for globalization 


172707 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=172707>  

VERI 

1.0 M6 

General - Fix Multiple Occurences on Role Descriptors 

-        Steve to close this issue.

-         

 

 

Jaana asked about issue 171152 Lifecycle diagram. Initially we were waiting
for the services of a graphic artist to assist in the development of a
dramatic lifecycle diagram, but it was pointed out that a graphic artist
will only help us "pretty up" the diagram. We have a number of "candidate"
lifecycle diagrams which either don't fully convey the message of the OpenUP
lifecycle or end up obscuring it in a blizzard of details. Jaana will lead
the effort to bring focus to creating an effective lifecycle diagram that
conveys our intention behind OpenUP.

 

Best regards,

Steve

_______________________________________________
epf-dev mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/epf-dev

Reply via email to