Hi Dr Chatterjee I explained the problems with your code on the Equis Forum website. There was a forward reference in two of the formulas ( Ref(X,1) instead of Ref(X,-1) ), and the third problem was with an Fml() function using the wrong formula name. All of these problems should have been picked up by attempting to display the results of each indicator on a chart as per Bill's suggestion.
Regards Roy ----- Original Message ----- From: [email protected] To: [email protected] Sent: Wednesday, November 06, 2013 4:57 AM Subject: RE: Re: [EquisMetaStock Group] Metastock Exploration code I find it when I run the Exploration Fml( "TD Count Down Buy C") =1 (Please refer to my post---De Mark Count Down buy) It appears in the rejects column of the exploration report. Regards, Dr.Chatterjee ---In [email protected], <pfertig@...> wrote: Hi, the reason is that a mathematical calculation leads to an event which is not defined. Often it is a division by zero. Have you checked your data manually for the date you receive this error message?. best regards Peter "sournila@..." <sournila@...> schrieb am 14:54 Dienstag, 5.November 2013: Sometimes when I write a code in the explorer and run the exploration ---the rejects column shows "Results of the formula not defined on calculation date"---Why does this appear? Can someone explain? Regards, Dr.Chatterjee __________ Information from ESET NOD32 Antivirus, version of virus signature database 9018 (20131107) __________ The message was checked by ESET NOD32 Antivirus. http://www.eset.com __________ Information from ESET NOD32 Antivirus, version of virus signature database 9019 (20131107) __________ The message was checked by ESET NOD32 Antivirus. http://www.eset.com
