Hi Geo,
It does not seem to match. There are lots of
differences between the two.
---In [email protected], <gawdib@...> wrote:
Maybe: emv(13,e)
versus
mov(emv(7,e),6,vol)
?
On Mon, Nov 11, 2013 at 12:21 AM, <georgeabraham3@...
mailto:georgeabraham3@...> wrote:
Hi,
In Metastock, while plotting the Ease of Movement indicator, under
Ease of Movement indicator properties, we can choose the time periods, and also
the methods, namely, Simple, Exponential, Weighted, Time series, Triangular,
Variable and Volume adjusted.
We can plot an Ease of Movement indicator with 13 periods and
Volume adjusted. Ease of Movement(13,Vol. Adjusted).
But, while writing an exploration to find the same 13 period volume adjusted
Ease of Movement indicator crossing over the zero line, Metastock does not
permit the use of the Volume Adjusted method.
For example, Cross(emv(13,v),0) is not permitted. Can any one tell
me why this is so.
Is there any way to write a code for a 13 period Volume adjusted Ease of
Movement crossing the zero line?
Any help would be greatly appreciated
Thanks,
George