Hi Cor and All,
                  By far the best, lowest cost is drops on near every 
powerpole, first at shopping, downtown, commercial then as EV's really get 
going on most blocks starting with apartments, etc.  A short, easy power run 
makes them by far the low cost to install, the big cost.                 Vs 
most installed street lights have poor power supply with 3-8 on a single 120vac 
circuit I've found doing electrical work.  Thus many times require long runs of 
bigger wire through conduits too small.                   As utilities need to 
do V2G in the near future plus it's their business to handle, sell power they 
should be the ones to install most EV stations everywhere.                  US 
utilities are shrinking with shrinking demand which will only accelerate as 
home, building, factory, etc made power takes over. EV's are an opportunity 
they can't afford to miss.                                  Jerry Dycus
       From: Cor van de Water via EV <[email protected]>
 To: Electric Vehicle Discussion List <[email protected]> 
 Sent: Friday, December 5, 2014 5:39 AM
 Subject: [EVDL] BMW street light with charge plug
   
We just discussed this the other day:
Streetlights with charging plugs - what a concept!

Cor van de Water

 

  
-------------- next part --------------
An HTML attachment was scrubbed...
URL: 
<http://lists.evdl.org/private.cgi/ev-evdl.org/attachments/20141205/35123a13/attachment.htm>
_______________________________________________
UNSUBSCRIBE: http://www.evdl.org/help/index.html#usub
http://lists.evdl.org/listinfo.cgi/ev-evdl.org
For EV drag racing discussion, please use NEDRA 
(http://groups.yahoo.com/group/NEDRA)

Reply via email to