% Utilities' deep-pockets are actually rate-payer funded, the utility people
making these decisions do not drive Electric, nor do they involve EV drivers
in the decision process. There is nothing more wasteful than an EVSE
installed in a location drivers do not want to go, or its use-fee too high
so they do not use it. EVSE installations should be designed to be dynamic:
to be able to shift/relocated-to where it is needed. %

http://www.utilitydive.com/news/if-you-build-it-will-they-charge-utilities-cautious-in-plans-to-spur-elec/423982/
If you build it, will they charge?
August 10, 2016  Herman K. Trabish

[images   
http://www.utilitydive.com/user_media/diveimage/UD-AvistaChargers-2-08-07-2016.jpg
L1,2,3  / National Renewable Energy Lab

http://www.utilitydive.com/user_media/diveimage/UD-AvistaChargers-3-08-07-2016.jpg
California has by far the most EVs in the U.S., but utilities expect
adoption to accelerate in other states as well  / DOE Alternative Fuels Data
Center 
]

Utilities cautious in plans to spur electric vehicle adoption
Utilities are well positioned to enhance EV infrastructure, but many are
waiting for a push from regulators and the market
 
One utility's small electric vehicle charger pilot raises a big question:
Why is it taking so long to build the infrastructure that could drive the
plug-in car industry?

Avista Utilities will spend $3 million to install, own, and operate 272
grid-integrated electric vehicle (EV) chargers at about 200 residential,
workplace, and public charging sites in its Eastern Washington state service
territory. The utility's intent is to understand and prepare for managing
the impacts of a higher EV charging load on its system.

The state of Washington had over 16,000 EVs at the end of 2015 and the
Washington State Electric Vehicle Action Plan targets 50,000 plug-in
vehicles by 2020, according to Avista Utilities Manager of Electric
Transportation Rendall Farley.

The state currently has 1,544 public charging outlets, and it doesn’t take a
mathematician to divide 50,000 by 1,544 and get chaos. That is an
exaggeration of the imbalance, of course, because the number of chargers
will grow with the adoption of EVs. But it is emblematic of a potential
national imbalance between cars with plugs and spots to charge.

The U.S. has 482,217 EVs, according to Plug-in America, and there are 14,040
public charging stations and 35,006 charging outlets, according to the U.S.
Department of Energy.

Considering a level 2 charger’s 10 to 20 miles of range per hour of charging
rate, 35,000 chargers for more than 482,200 cars is not a formula for
convenience.

And, while small pilots like Avista’s are emerging, the imbalance may be
growing.

“Largely funded by DOE and state programs, there was a significant EV
infrastructure build-up between 2011 and 2014, GTM Research Senior Analyst
Ravi Manghani told Utility Dive, "but in recent months EV sales have
outstripped infrastructure growth."

To address the imbalance, the White House just announced a plan to make up
to $4.5 billion in loan guarantees available to accelerate EV growth. A key
goal of the plan is to stimulate public-private-utility partnerships that
will drive more deployment of charging infrastructure. The Department of
Energy also has a strategic partnership with the Edison Electric Institute,
the trade group for investor-owned utilities, to expand EV adoption.

Despite that, many utilities say they face the problem of whether to build
out EV charging infrastructure now, betting on later adoption, or to wait
for consumer demand to pick up, and risk slowing EV growth and being froze
out of the charging market. Though the Avista pilot's numbers are small, its
structure may point the way toward some larger strategies to solve the
national EV imbalance.

DC Fast Charging stations can be too expensive for private vendors to
install at public locations, opening an opportunity to deploy utility
capital.

The utility charger scene
Utilities would seem to have the deep pockets to support large charger
infrastructure builds and they could benefit from the increased load, but
they have been hampered by regulatory constraints.

“This is a tricky market for utilities,” said GTM Research Analyst Timotej
Gavrilovic.

In California, which leads the country in EV adoption, regulators scaled
back Southern California Edison’s $22 million Charge Ready pilot and San
Diego Gas and Electric’s $45 million Power Your Drive program in final
approvals. Pacific Gas and Electric proposed the most ambitious U.S. utility
charger installation program, has twice had it scaled back by regulators,
and is still awaiting a final ruling.

The Los Angeles Department of Water and Power faces a mandate requiring
electrification of 80% the city’s fleet vehicles by 2025. At present, it is
focusing on its own fleet, providing technical and other kinds of support
for other City Departments, and “exploring new technologies,” according to
Spokesperson Amanda Parsons.

The utility’s PlugShare network of 16 DC Fast Chargers has proven to include
“some of the most popular chargers in the state,” she added.

In Los Angeles, where there are approximately 20 electric vehicles for every
public charger, the buildout of public and workplace infrastructure “is
seriously lagging,” Parsons said. “The ratio should be more like four or
five vehicles to one public charger.”

LADWP's Charge Up LA! rebate program targets growth in public, workplace,
and multi-family dwellings by offering rebates of up to $4000 per charger on
up to 20 chargers per site, she said.

Massachusetts is second to California in EV adoption. Both Eversource and
National Grid, the Bay State's dominant electricity providers, are both
working on charger infrastructure.

National Grid now has over 150 public level 2 stations across its
multi-state footprint and is installing three public fast-charging stations
in Boston as demonstrations, according to Spokesperson Danielle Williamson.

National Grid expects that new vehicles in the marketplace, continued
federal and state vehicle incentives, and increasing consumer demand will
continue to drive EV adoption, she said.

The utility understands this means there will be a growing need for more
public EV charging infrastructure and foresees a coming policy signal,
Williamson said. Because of state Zero Emission Vehicle goals, “we expect
our states to require substantially more public charging options in the next
several years.”

Eversource had “about 6,500 plug-in EVs in our service territory with over
700 publicly accessible charging stations in our region,” reported Energy
Manager for Research and Business Development Watson Collins.

The New England utility also began working with the State of Connecticut on
the pilot Plug My Ride rate plan. The program will offer up to 105 EV owners
a rate designed “to encourage off-peak charging with innovative technologies
that enable charging in a grid-friendly manner,” Collins said.

“Parts of the EV charging infrastructure build-out are progressing well and
other parts of the infrastructure build face challenges,” he added.

Charging infrastructure for single family homes is responding to the market,
but progress on the build-out of DC Fast Chargers, of workplace and public
charging infrastructure, and of charging stations for multi-family dwellings
“is more inconsistent,” he said.

The Hawaiian Electric Company (HECO) just got regulatory approval to
install, own, and operate up to 25 EV fast chargers. The utility has
installed eight, and is making plans “to locate them strategically,
especially in remote locations with limited public charging,” said
Spokesperson Peter Rosegg.

eHECO has one of the biggest EV fleets in Hawaii, supported by onsite level
2 chargers, and is planning a workplace charger build-out for utility
employees, Rosegg added. HECO is also working with a private sector start-up
that will provide mobile charging to improve access at multi-family
dwellings.

Charging infrastructure and EVs in Hawaii are presently “growing apace,”
Rosegg said. Though some areas are underserved and there is a growing demand
for fast chargers, the state has “a relatively large number of public level
1 and level 2 chargers.”

Providing access to charging will continue to be a challenge as EV adoption
grows, Rosegg added, because rising demand has to be balanced by
deliberateness in finding the right sites and in using ratepayer capital.

California has by far the most EVs in the U.S., but utilities expect
adoption to accelerate in other states as well.
 
If you build it, will they charge?
Deliberateness aside, the question remains if enough utilities and
commissions are being proactive enough to help boost EV growth. California’s
IOUs have each proposed thousands of charging points, but elsewhere, most EV
pilots remain closer to the size of Avista’s — a few hundred.

"The 200 or so chargers is a pretty small number,” said Chris Nelder, a
manager in the Rocky Mountain Institute (RMI) electricity program and lead
author of the recently-released report “Electric Vehicles as Distributed
Energy Resources.”

“But,” Nelder said, “there need to be vehicles to justify building chargers
and there need to be chargers before people will buy vehicles."

Nationwide, that chicken-or-the-egg problem of whether to build chargers
first or wait for adoption to spike is a common problem for the EV sector.  

“EVs are 0.16% of vehicles on the road and 0.7% of new vehicle sales per
year,” Nelder said. “That is too small to attract the needed investment for
chargers and if more chargers were to get built, the investor would end up
asking ‘where are all the EVs to plug in?’”

“While it is true that ‘if you build it, they will come,’ it is not easy to
invest millions of dollars without seeing commensurate EV growth,” Manghani
said.

Traditional financial markets have been unwilling to supply the “at least $2
billion to $4 billion” necessary for adequate charger infrastructure to
“move the needle,” added Gavrilovic. "Almost half of existing charging
infrastructure was built with state and federal funding."

ChargePoint, the dominant private sector player to date, has invested $170
million to build thousands of public charging spots, the company reports,
but a new federal financing program could open up significantly more money.

A newly-announced $4.5 billion in federal loan guarantees can connect needed
levels of funding to such entrepreneurs. Gavrilovic expects the initiative
to have a noticeable impact by mid-to-late 2017.

Other private sector players that could benefit from the loan guarantee
opportunity include EV makers Tesla and Nissan and charger manufacturers
ABB, AeroVironment, NRG/EVGO, Eaton, Car Charging Group, Schneider, General
Electric, according to Gavrilovic.

Emotorwerks has built thousands of mostly residential charge spots but is
now focusing its efforts on adding software to its own and other suppliers’
hardware to make them "smart." It is also pushing for more such efforts.

“The build-out of public level 2 chargers is going slow because there is no
viable economic model behind it,” said emotorwerks CEO Valery Miftakov. “The
hardware is too expensive, installation is too expensive, and there is no
grid service revenue to capture.”

Though his smart charger company is ahead of most utilities at building out
EV infrastructure,  “the move to electricity as a dominant transportation
fuel is an enormous opportunity for them,” Miftakov said. “They should be at
the forefront of stimulating EVs and smart-grid charging, while allowing the
competitive marketplace to perfect the technologies.”

The Avista pilot’s importance
In its two year pilot, Avista hopes to lay the groundwork to help it be at
the forefront of EV adoption and management. The utility will build
residential level 2 chargers and workplace and public location chargers,
including seven level 3 DC fast chargers.

It is “something of an experiment for where we are now and to stay a little
ahead of the curve,” Farley said. It is the beginning of “a strategic
long-term play.”

The cost of driving electric is presently under $1 per gallon nationally and
at 60 cents per gallon in Avista’s territory, Farley said. “It will always
be lower than gasoline-fueled vehicles even at low gasoline prices.”

The utility’s expectation is that EV adoption will grow because they will
become even more affordable, performance will get better, and the public’s
concerns about the pollution and greenhouse gas emissions from fossil fuel
powered vehicles will grow, Farley said.

When adoption reaches a significant penetration, a large number of EV owners
coming home in the evening and plugging in could add a problematic load
spike in the middle of a utility’s peak demand, according to RMI’s Nelder.
But smartly deployed charging stations and the right price signals to
customers can manage EV charging so that the load does not worsen peak
demand and “could reduce the unit cost of electricity by eliminating the
need to invest in peaking capacity.”

Learning how to manage a system’s EV charging load is a big part of the
purpose of the Avista pilot, Farley said. Being prepared for what an EV
expansion would mean to its system is part of a utility's core obligation to
provide safe reliable electricity at the lowest possible cost.

“This industry is in its infancy and adoption in Eastern Washington is much
lower than in other places,” Farley said. “But driving electric is coming
and this is our opportunity to learn and to help shape something that will
benefit all our customers when adoption increases.”

Avista will use Greenlots’ hardware-agnostic SKY platform to integrate a
range of charging station technologies into its system. Vendors include
Siemens, BTC, EVSE, Efacec, and others.

A number of other utilities, including Southern California Edison, Hawaiian
Electric, and the Southern California Public Power Authority, have already
used Greenlots’ software for EV charger, demand side management, and energy
storage management programs.

“It is not just more EVs, but EVs with bigger batteries that makes pilots
like Avista’s important,” said Greenlots CEO Brett Hauser. “The 2017 and
2018 EVs will have 200 mile or more ranges. The highest output chargers now
are 50 kW but in the not-too-distant future it will be necessary to have
chargers of at least 100 kW to 150kW.”

A number of those at a workplace could represent a 1 MW or more demand on
the grid, Hauser said. “The best way to handle that is to think of it as a
distributed energy resource and couple fast-charging with storage in the
same way they are planning to couple solar and storage.”

That kind of planning will increase utilities’ grid flexibility, reduce
infrastructure costs, and provide the charging services EV drivers need,
Hauser added. “Utilities can be proactive or reactive. With this pilot,
Avista and its commission are being proactive.”

Can utilities lead a collaboration?
Utility involvement in the charger build-out is double-edged because they
have the balance sheets, but they don’t have the expertise, Gavrilovic said.

Both emotorwerk’s Miftakov and Gavrilovic said they see infrastructure
deployment as a broader stakeholder process. Utilities can build “the pipes
and wires to the charging outlet and let private sector providers take it
from there," Gavrilovic said.

Funding through state and federal sources will continue to be “key,” he
added.

If utilities were to focus on home and workspace charging, it would drive
the market, Miftakov added. They should “build stub-outs, enable
sub-metering through stations, and give customers incentives to buy
smart-grid enabled charging stations instead of the dumb stations.”

Though National Grid has supported deployment of public charging
infrastructure through a range of funding, “revenues paid by EV drivers at
the stations or via membership fees do not appear sufficient to support the
payback of capital invested,” Williamson observed.

“We do not yet see a viable independent business model emerging for public
charging operations,” she added.

Until pilot programs demonstrate how utility involvement can enable the EV
charger market, she said, collaboration between state agencies, automakers,
EV charging manufacturers, installers, utilities and others stakeholders
will be required to provide the charging infrastructure needed to support EV
growth goals.

Cost and permitting barriers to residential charging infrastructure have
been driven down in Eversource territory by robust competition, Collins
said. But the “lack of alignment of interests” is blocking the public
build-out needed.

Large commercial property owners who might install charging don’t have the
incentives that provide the “economic motivations” that EV drivers have, he
said.

A utility coordinated program could overcome that barrier, but Eversource,
like National Grid, is waiting for regulators to indicate it should become
more proactive.

EV charging infrastructure is “the next opportunity” and utilities’ “scope
and scale” can grow it by making it easy for site hosts and drivers, Collins
said. “It is what we do; build, own and operate large-scale infrastructure
to move electricity.”

HECO sees many of the same opportunities in EV adoption that Avista’s Farley
described. Smartly deployed and managed, chargers can increase overall load
while reducing overall fixed utility costs, Rosegg said. They can also be “a
great use for excess electricity from the growing grid-scale and
customer-sited solar.”

There are opportunities for both utilities and private providers, Rosegg
said. The cost of DC fast chargers may make installing them unprofitable for
private providers. But because of the advantages charging offers the
utility, HECO’s program is entirely publicly-sited DC fast chargers and it
purchases equipment and services from private sector providers through a
competitive bidding process.

“Electric transportation is the only program that has the potential to lower
the cost of electricity for all LADWP customers, both those that drive
electric and those that do not,” Parsons said.

If customers charge off-peak, the electricity can be delivered with minimal
capital investment. “Electricity cost is based on cents/kWh,” Parsons
explained. “If we make the kWh large with very little cents, it makes the
cost of electricity cheaper.”

EVs will also add night time load for contracted wind power and, eventually,
will be critical to mid-day solar over-generation.    

But the build-out continues to be obstructed by “a lack of a business case”
because “there is a difficult financial return on investment for the cost of
the charger and installation,” Parsons said.

There is also a lack of education about both EV charger infrastructure and
about how customers can obtain them. “Utilities need to do a better job
helping customers,” she said.

Various models for utility participation have emerged, but “in an ideal
world, LADWP would prefer not to own or operate chargers or anything
downstream of the customer’s meter,” Parsons said. “Our desire is to support
and make our customers successful, no matter what their business model is.”

LADWP is likely to evenutally own "some" infrastructure but "our preference
is to take away some of the barriers to EV charging and support those that
choose to be in this space," Parsons said. "Working together with customers
and installation companies, we see a greater opportunity for success."

Charging for the public interest
The logical progression of EV adoption, RMI’s Nelder said, is that people
will buy vehicles and charge at home until there is a critical mass that
drives the deployment of chargers at workplaces and public parking places.

Next, mandates by municipalities like the one LADWP faces will grow
economies of scale, bringing the cost per charger and per installation down,
he said.

If regulators allow it, utilities will “step up,” Nelder said. They know the
sites that will provide the most value to their systems at the lowest cost.
That will spur further cost-effectiveness.

“But the utility does not necessarily have to own or operate or install the
infrastructure,” he said. “That is a different question.”

The one thing that is clear to him, however, is that utilities’ strong
balance sheets, access to low cost capital, and deep knowledge of their
systems would allow them to grow more public charging infrastructure faster.

“The more difficult question is whether that is in the best interest of the
public,” he said. “I don’t know the answer to that.”

It is not inevitable that utilities would push out private sector players
because regulators can impose whatever restrictions and requirements are
necessary to prevent that, Nelder said.

“The right times and places to charge EVs will vary, depending on the type
of grid and the type of resources,” Nelder said. “In sunny places, charging
can absorb mid-day solar over-generation. In other places, it can alleviate
wind curtailment at night. There is no one-size-fits-all answer."
[© 2016 Industry Dive]




For EVLN EV-newswire posts use: 
http://evdl.org/evln/


{brucedp.0catch.com}

--
View this message in context: 
http://electric-vehicle-discussion-list.413529.n4.nabble.com/If-you-build-it-will-they-charge-Utilities-cautious-plans-to-spur-electric-vehicle-adoption-tp4683304.html
Sent from the Electric Vehicle Discussion List mailing list archive at 
Nabble.com.
_______________________________________________
UNSUBSCRIBE: http://www.evdl.org/help/index.html#usub
http://lists.evdl.org/listinfo.cgi/ev-evdl.org
Read EVAngel's EV News at http://evdl.org/evln/
Please discuss EV drag racing at NEDRA (http://groups.yahoo.com/group/NEDRA)

Reply via email to