> Each charger would require its own electrical substation.

Really?  I'm far from an expert on electric utility issues, but 400kW is 
about the total peak capacity of 4 recently built bloated McMansions (main 
panel == 400 amps at 240 volts).  I don't see a substation for every 4 
houses in those neighborhoods, but maybe I'm missing something.   And of 
course those houses aren't all running at peak load all the time, either.

David Roden - Akron, Ohio, USA