On 6 Sep 2018 at 20:00, Alan Arrison via EV wrote: > Each charger would require its own electrical substation.
Really? I'm far from an expert on electric utility issues, but 400kW is about the total peak capacity of 4 recently built bloated McMansions (main panel == 400 amps at 240 volts). I don't see a substation for every 4 houses in those neighborhoods, but maybe I'm missing something. And of course those houses aren't all running at peak load all the time, either. David Roden - Akron, Ohio, USA EVDL Administrator = = = = = = = = = = = = = = = = = = = = = = = = = = = = = EVDL Information: http://www.evdl.org/help/ = = = = = = = = = = = = = = = = = = = = = = = = = = = = = Note: mail sent to "evpost" and "etpost" addresses will not reach me. To send a private message, please obtain my email address from the webpage http://www.evdl.org/help/ . = = = = = = = = = = = = = = = = = = = = = = = = = = = = = _______________________________________________ UNSUBSCRIBE: http://www.evdl.org/help/index.html#usub http://lists.evdl.org/listinfo.cgi/ev-evdl.org Please discuss EV drag racing at NEDRA (http://groups.yahoo.com/group/NEDRA)
