On 12/3/20 8:36 AM, Willie via EV wrote:


On 12/3/20 7:08 AM, Jay Summet via EV wrote:

I've used several combinations of parallel chargers on my Hyundai conversion.  Mostly to match available AC power and the amount of trouble I wanted to go to to get a "fast" charge.  No trouble whatsoever.  That was "bulk" charging, rarely used when I wanted a complete charge which was typically done overnight with a single charger.

I believe Bruce has many times related parallel charging on his lead S10.  Again, to match available AC power.


You and Bruce are the "active monitoring agent" in those situations. As long as the various AC chargers are isolated, it's fine to plug in many in parallel in the bulk charge phase.

The advantage of the Dual TSM2500 paired with the EVCC is that the EVCC talks to both chargers over the can bus and will make sure they both turn off at the right point (max voltage reached or BMS alarm). It's a "permanent always active every charge" solution.

Jay
_______________________________________________
UNSUBSCRIBE: http://www.evdl.org/help/index.html#usub
ARCHIVE: http://www.evdl.org/archive/index.html
INFO: http://lists.evdl.org/listinfo.cgi/ev-evdl.org
Please discuss EV drag racing at NEDRA (http://groups.yahoo.com/group/NEDRA)

Reply via email to