Currently we have a primary Hub/CAS server and secondary Hub/CAS server along with a Primary Mailbox Server and Secondary Mailbox server on LAN 10.0.55.x. We have a DR site with a Tertiary Hub/CAS/Mailbox server on a separate LAN across a 100Mb pipe. We have a Cluster of the Hub/CAS servers and the production and DR sites. And the DAG is across the WAN as well. We have a DPM 2010 server backing up the DAG. This staying un completed most of the time. With the Primary and Secondary pieces of the DAG getting complete back ups but tertiary is just running all the time at 80Mb. (Yes eating at my sole.).
Can I use Veeam to back all of these servers up? And drop the DPM 2010?? Will I still be using up my bandwidth from DR to Production at the same rate as the DPM 2010 software? Is there a better practice for Exchange 2010 and being Highly available?? Thanks and I promise I will try and answer with the best and most accurate responses. Active directory is still 2008 and the Exchange servers are 2008 but the DPM server is 2012. Thanks again. This e-mail and any files transmitted with it are property of Indiana Members Credit Union, are confidential, and are intended solely for the use of the individual or entity to whom this e-mail is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this email is strictly prohibited. Please consider the environment before printing this email.
