MSX5.5, 1 exchange organization.
We have one MSX Organization and two servers, each server has a X400
connector to a particular site
X400 connectorA schedule=always (in ServerA), cost =1
X400 connectorB schedule=selected time (in ServerB), cost =80
X400 connectorB is on shcedule from 3AM to 4PM....
As from what I can see messages in the connectorB pending to be deliver (at
3AM) remain there until next day at 4PM.
Note: X400 works properly during "selected time"
Question: Do not they should go *automatically* to the X400 connectorA? or
is ok for the messages to remain there until next time the connector reaches
the selected times?
Thanks,
-ER
_________________________________________________________________
List posting FAQ: http://www.swinc.com/resource/exch_faq.htm
Archives: http://www.swynk.com/sitesearch/search.asp
To unsubscribe: mailto:[EMAIL PROTECTED]
Exchange List admin: [EMAIL PROTECTED]