Getting to the point in my E2k rollout where I only have the first server in
the
site to removed (ex.5.5).  I'm running OWA (ex5.5), but, want to know if I
can
install my first front-end server (E2K) and have both up running at the same
time?
Probably be atleast another month before I pull the plug on the remaining
5.5
server.

Ron

_________________________________________________________________
List posting FAQ:       http://www.swinc.com/resource/exch_faq.htm
Archives:               http://www.swynk.com/sitesearch/search.asp
To unsubscribe:         mailto:[EMAIL PROTECTED]
Exchange List admin:    [EMAIL PROTECTED]

Reply via email to