Hey Guys, I am about to Upgradde pt6 zikula to Zikula 1.1.2 The upgrade process should take between 10-20 Minutes using the zikula patch files.
I have backed up the database to : /usr/share/zikula-preupgrade-backup The Theme has been copied to the theme SVN as mentioned in a previous email to the designs list. Regards, Keiran Smith - Fedora Ambassador / BugZapper / Designer - <[email protected]> - Free Software Foundation Associate - <[email protected]> - http://keiran-smith.net - Call me on +44 (0) 131 208 4347
_______________________________________________ Fedora-infrastructure-list mailing list [email protected] https://www.redhat.com/mailman/listinfo/fedora-infrastructure-list
