We had a very productive meeting!

In attendance Al B (Flying Squirrel) Mike (Flying Squirrel) Alex Bellanca, Ellis (Alex's assistant), Bret (Food Not Bombs), Ash (Food Not Bombs)

The stove has  been moved into its alcove under the hood woot woot!

Gas line may need to be shortened depending on where stove is eventually positioned

Are we going to put a normal sized fridge back in the kitchen? (FNB says that would be a big help)     if we do it might require a dedicated electrical outlet, Alex and Ash will check building code

Estimate $300 for materials, plus labor for ceiling
    Ceiling teardown and replacement can be completed in 1-2 days
    plan is to use same materials as for ceiling in main room
    panels would be removable permitting non-destructive access to anything above ceiling
    same materials as will be used in main room
    we found some furring strips in the basement which can be used for this project
    tables and counters will need to be moved out
    should wait until Christmas display is taken down, sometime in mid-January
    goal is to have ceiling done by end of January

    Cost of floor replacement will need to wait until old floor at least partially removed so we can see what there is to work with

We may need to get more metal counter tops and tables for kitchen to comply with health codes
    Need to discuss with our architect or health department



_______________________________________________
Flying-squirrel-members mailing list
[email protected]
https://lists.mayfirst.org/mailman/listinfo/flying-squirrel-members

To unsubscribe, send an email to:
[email protected]
(The subject and body of the email don't matter)

Reply via email to