I have a form for estimates that takes in the number of hours estimated,
multiplies it by a rate selected from a drop down and puts the cost in the
Estimated Cost field.

Estimated Cost Field = Rate Field * Rate Field.

-- 
<http://forum.pspad.com/read.php?2,44499,46340>
PSPad freeware editor http://www.pspad.com

Odpovedet emailem