I have a form for estimates that takes in the number of hours estimated, multiplies it by a rate selected from a drop down and puts the cost in the Estimated Cost field.
Estimated Cost Field = Rate Field * Rate Field. -- <http://forum.pspad.com/read.php?2,44499,46340> PSPad freeware editor http://www.pspad.com
