Title: [t13] Agenda for T13 Ad-Hoc Working Group Sep 19, 2003

Here is the updated Agenda for T13 Ad-Hoc Working Group Sep 19, 2003
These are the Action Items (AI) from the last T13 face-to-face meeting that we will be discussing at the Webex telecon on Friday. We plan to touch on open items 2-5, 10-11 only if there is new information or comments. The main focus is expected to be Items 12, 14, and 15.

1) CLOSED 9/4/03
2) AI 8 - 14.5.6.1 Idle Bus State: During the idle bus condition, the differential signal diminishes to zero while the common mode level of 250 mV remains. Should this be for DC coupled only?

3) AI 5 - Power-on Sequence fig 39 Clause 14.5.6.2.8 step g) device responds, is different than COMRESET clause 14.5.6.2.3.1 step f) and COMINIT 14.5.6.2.4 step d) should they be the same? COMRESET/COMINIT says speed adjust is 2048 Dwords, Power-on description 14.5.6.2.8 g) says to transmit them for 54.6us at that rate. Which is correct? Also ensure State diagrams and state descriptions are correct.

4) AI 10 - 14.5.6.2.8 In Power-on Sequence clause it says:
Host/device power-off - Host and device power-off. There is host side signal conditioning that will pull the host TX and RX pairs low if power is off. Is this correct?

5) AI 9 - Clause 15.4.8.1 Table 23 - 20 Dword Latency example does not add up to 20.
6) CLOSED 9/4/03
7) CLOSED 9/4/03
8) CLOSED 9/4/03
9) CLOSED 9/4/03
10) AI 12 18.1 (Done) Integrate nIEN information to 18.1.
11) AI 13 - Non-existent devices in Vol 1.
12) E03129r0 AI 18, 19, 20 - Incorporate time limited RW updates (if approved).
13) E03126r0 - Add new connector to Vol 3 if approved, to be provided by Knut.
14) E03120r0 AI 3 - Incorporate Unload immediate if approved.
15) E03133r0 AI 4 - DCO Updates from Hatfield’s proposal if approved.
John Masiewicz
Western Digital
t13 editor

Reply via email to