At 11:31 AM 6/8/01 +1200, Phil So wrote:
>[...]
>It took 22 min, 16 sec. for the DRC to finish on the Rev. A design.  It took
>10 sec. for the DRC to finish on the Rev. B design.
>[...]
>The design has 37 nets, 76 components and 212 pads and vias on it.

The Rev A DRC time is astonishing for such a simple board, even with the 
number of design rules he mentioned. Rev B is normal. From the limited 
information Mr. So gave, I don't have any specific ideas; what I would do 
is to experiment with the Rev A file to find out what is causing the long 
DRC time. Unchecking half the rules, then the other half, and then half of 
the half, etc., might track down the problem. I'd be willing to look at it 
if Mr. So sends me the file.

[EMAIL PROTECTED]
Abdulrahman Lomax
P.O. Box 690
El Verano, CA 95433

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* To post a message: mailto:[EMAIL PROTECTED]
*
* To leave this list visit:
* http://www.techservinc.com/protelusers/subscrib.html
*                      - or email -
* mailto:[EMAIL PROTECTED]?body=leave%20proteledaforum
*
* Contact the list manager:
* mailto:[EMAIL PROTECTED]
*
* Browse or Search previous postings:
* http://www.mail-archive.com/[email protected]
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Reply via email to