3 town meeting members - peggy groppo, steve orr
and kathy vassar attended for pct 1
WAYSIDE TRAILS
- the blasting was approved by a vote of
3-0-1 (in favor bob venne, andy toorock and tom komola; none opposed;and
one abstained, bill merriam. rationale: there had been no
complaints/problems with the blasting for the roadway at the site. no wells
seemed to have been impacted by that blasting. there was no
project engineer present to answer questions raised.
BRIMSTONE
- questions were raised by celia o'brien
about alternate ACCESS (road from the nw sector of property?).
several members questioned whether this should even be considered as a LIMITED PROJECT as it was
stated the planning board has never officially rejected a plan that does
not include the crossing. also included a
discussion about whether or not the wetlands should be REPLICATED
as it would mean cutting down 5,000 square feet of
trees. (under a limited project there is some discretion to allow for
not replicating the wetlands, but otherwise it would be mandated on a 1:1
basis) the proposed SEWER PUMPING STATION will not be in
the area of wetlands and there is room elsewhere on the site for an
underground WATER TANK for fire protection.
CONTINUED until JULY 3 @ 8p.m.
(the applicant complained about the lenght of the
process but it was pointed out that most of the continuances had been by
the request of the applicant or his agents) happy
4th!!
attended by planning board member, larry marsh, and
tmms norma shulman(pct 3) and tod robecki(pct 7)
HICKEY DR swimming pool and filled
area (pct 7)-
(can someone please fill in the
details) CONTINUED until ?
kathy vassar
|