Ah the value of Central Planning.

 

REH

 

From: [email protected]
[mailto:[email protected]] On Behalf Of Robert Stennett
Sent: Sunday, June 26, 2011 10:50 AM
To: EDUCATION RE-DESIGNING WORK INCOME DISTRIBUTION
Subject: [Futurework] Bridge Comes to San Francisco, With Made-in-China
Label - NYTimes.com

 

http://www.nytimes.com/2011/06/26/business/global/26bridge.html?nl=todayshea
dlines
<http://www.nytimes.com/2011/06/26/business/global/26bridge.html?nl=todayshe
adlines&emc=tha23> &emc=tha23

 


Bridge Comes to San Francisco With a Made-in-China Label


 
<http://graphics8.nytimes.com/images/2011/06/26/world/26bridge-span/26bridge
-span-articleLarge-v2.jpg> 

Ryan Pyle for The New York Times

Workers at Shanghai Zhenhua finish the welding on a section of the eastern
span of the San Francisco-Oakland Bay Bridge. 


By DAVID BARBOZA
<http://topics.nytimes.com/top/reference/timestopics/people/b/david_barboza/
index.html?inline=nyt-per> 


Published: June 25, 2011


SHANGHAI - Talk about outsourcing. 


 
<http://graphics8.nytimes.com/images/2011/06/26/world/JP-BRIDGE/JP-BRIDGE-ar
ticleInline.jpg> 


Jim Wilson/The New York Times


The San Francisco-Oakland Bay Bridge. The replacement eastern span is on the
right, with the city of San Francisco beyond. 

At a sprawling manufacturing complex here, hundreds of Chinese laborers are
now completing work on the San Francisco-Oakland Bay Bridge. 

Next month, the last four of more than two dozen giant steel modules - each
with a roadbed segment about half the size of a football field - will be
loaded onto a huge ship and transported 6,500 miles to Oakland. There, they
will be assembled to fit into the eastern span of the new Bay Bridge. 

The project is part of China's continual move up the global economic value
chain - from cheap toys to Apple iPads to commercial jetliners - as it aims
to become the world's civil engineer. 

The assembly work in California, and the pouring of the concrete road
surface, will be done by Americans. But construction of the bridge decks and
the materials that went into them are a Made in China affair. California
officials say the state saved hundreds of millions of dollars by turning to
China. 

"They've produced a pretty impressive bridge for us," Tony Anziano, a
program manager at the California Department of Transportation, said a few
weeks ago. He was touring the 1.2-square-mile manufacturing site that the
Chinese company created to do the bridge work. "Four years ago, there were
just steel plates here and lots of orange groves." 

On the reputation of showcase projects like Beijing's Olympic-size airport
terminal and the mammoth hydroelectric
<http://topics.nytimes.com/top/reference/timestopics/subjects/h/hydroelectri
c_power/index.html?inline=nyt-classifier>  Three Gorges Dam, Chinese
companies have been hired to build copper mines in the Congo, high-speed
rail
<http://topics.nytimes.com/top/reference/timestopics/subjects/h/high_speed_r
ail_projects/index.html?inline=nyt-classifier>  lines in Brazil and huge
apartment complexes in Saudi Arabia. 

In New York City alone, Chinese companies have won contracts to help
renovate the subway system, refurbish the Alexander Hamilton Bridge over the
Harlem River and build a new Metro-North train platform near Yankee Stadium.
As with the Bay Bridge, American union labor would carry out most of the
work done on United States soil. 

American steelworker unions have disparaged the Bay Bridge contract by
accusing the state of California of sending good jobs overseas and settling
for what they deride as poor-quality Chinese steel. Industry groups in the
United States and other countries have raised questions about the safety and
quality of Chinese workmanship on such projects. Indeed, China has had
quality control problems ranging from tainted milk to poorly built schools. 

But executives and officials who have awarded the various Chinese contracts
say their audits have convinced them of the projects' engineering integrity.
And they note that with the full financial force of the Chinese government
behind its infrastructure companies, the monumental scale of the work, and
the prices bid, are hard for private industry elsewhere to beat. 

The new Bay Bridge, expected to open to traffic in 2013, will replace a
structure that has never been quite the same since the 1989 Bay Area
earthquake. At $7.2 billion, it will be one of the most expensive structures
ever built. But California officials estimate that they will save at least
$400 million by having so much of the work done in China. (California issued
bonds to finance the project, and will look to recoup the cost through
tolls.) 

California authorities say they had little choice but to rebuild major
sections of the bridge, despite repairs made after the earthquake caused a
section of the eastern span to collapse onto the lower deck. Seismic safety
testing persuaded the state that much of the bridge needed to be overhauled
and made more quake-resistant. 

Eventually, the California Department of Transportation decided to revamp
the western span of the bridge (which connects San Francisco to Yerba Buena
Island) and replace the 2.2-mile eastern span (which links Yerba Buena to
Oakland). 

On the eastern span, officials decided to build a suspension bridge with a
complex design. The span will have a single, 525-foot tower, anchored to
bedrock and supported by a single, enormous steel-wire cable that threads
through the suspension bridge. 

"We wanted something strong and secure, but we also wanted something
iconic," said Bart Ney, a transportation department spokesman.        

 A joint venture between two American companies, American Bridge and Fluor
Enterprises, won the prime contract for the project in early 2006. Their bid
specified getting much of the fabricated steel from overseas, to save money.



California decided not to apply for federal funding for the project because
the "Buy America" provisos would probably have required purchasing more
expensive steel and fabrication from United States manufacturers.


China, the world's biggest steel maker, was the front-runner, particularly
because it has dominated bridge building for the last decade. Several years
ago, Shanghai opened a 20-mile sea bridge; the country is now planning a
much longer one near Hong Kong. 

The selection of the state-owned Shanghai Zhenhua Heavy Industries Company
was a surprise, though, because the company made port cranes and had no
bridge building experience. 

But California officials and executives at American Bridge said Zhenhua's
advantages included its huge steel fabrication facilities, its large
low-cost work force and its solid finances. (The company even had its own
port and ships.) 

"I don't think the U.S. fabrication industry could put a project like this
together," Brian A. Petersen, project director for the American Bridge/Fluor
Enterprises joint venture, said in a telephone interview. "Most U.S.
companies don't have these types of warehouses, equipment or the cash flow.
The Chinese load the ships, and it's their ships that deliver to our piers."


Despite the American union complaints, former California Gov. Arnold
Schwarzenegger, a Republican, strongly backed the project and even visited
Zhenhua's plant last September, praising "the workers that are building our
Bay Bridge." 

Zhenhua put 3,000 employees to work on the project: steel-cutters, welders,
polishers and engineers. The company built the main bridge tower, which was
shipped in mid-2009, and a total of 28 bridge decks - the massive triangular
steel structures that will serve as the roadway platform. 

Pan Zhongwang, a 55-year-old steel polisher, is a typical Zhenhua worker. He
arrives at 7 a.m. and leaves at 11 p.m., often working seven days a week. He
lives in a company dorm and earns about $12 a day. 

"It used to be $9 a day, now it's $12," he said Wednesday morning, while
polishing one of the decks for the new Bay Bridge. "Everything is getting
more expensive. They should raise our pay." 

To ensure the bridge meets safety standards, 250 employees and consultants
working for the state of California and American Bridge/Fluor also took up
residence in Shanghai. 

Asked about reports that some American labor groups had blocked bridge
shipments from arriving in Oakland, Mr. Anziano dismissed those as confused.


"That was not about China," he said. "It was a disagreement between unions
about which had jurisdiction and who had the right to unload a shipment.
That was resolved."        

 

_______________________________________________
Futurework mailing list
[email protected]
https://lists.uwaterloo.ca/mailman/listinfo/futurework

Reply via email to