Hello everyone,

I am trying to migrate from a single NT4 box running 4.1 SP5 to a
distributed NG R55 on two Win2003 boxes.  My license is VEE and not a
single gateway license; I just have the two modules in one NT box.  I am
following the advanced upgrade method with spare hardware to try to pull
this off.

My problem is that when I export the existing 4.1 configuration and try
to import it during the installation of R55 the install seems to go ok
but the end result is a standalone box with the VPN-1 and the
SmartCenter together.  I think the install program sees the existing
configuration as standalone and installs both the enforcement module as
well as management station.  I have no choice to separate the two during
the install.  What steps can I take to accomplish this?

Thank you.

Fred

=================================================
To set vacation, Out-Of-Office, or away messages,
send an email to [EMAIL PROTECTED]
in the BODY of the email add:
set fw-1-mailinglist nomail
=================================================
To unsubscribe from this mailing list,
please see the instructions at
http://www.checkpoint.com/services/mailing.html
=================================================
If you have any questions on how to change your
subscription options, email
[EMAIL PROTECTED]
=================================================

Reply via email to