This is an automated email from the git hooks/post-receive script. It was
generated because a ref change was pushed to the repository containing
the project "Ganeti core".

The branch, stable-2.11 has been updated
       via  ebd41f036a623512d33708ebfb4838bf1041614e (commit)
       via  733880a6f938ef49c37b308e133b4b6dab70e4a7 (commit)
      from  7bcc5fc0c904a60a459e80df1fd54053c63da64e (commit)

Those revisions listed above that are new to this repository have
not appeared on any other notification email; so we list those
revisions in full, below.

- Log -----------------------------------------------------------------
commit ebd41f036a623512d33708ebfb4838bf1041614e
Merge: 7bcc5fc 733880a
Author: Klaus Aehlig <[email protected]>
Date:   Tue Aug 19 17:19:32 2014 +0200

    Merge branch 'stable-2.10' into stable-2.11
    
    * stable-2.10
      Fix network info in case of multi NIC instances
    
    Conflicts:
        lib/cmdlib/network.py: use stable-2.11 version
    
    Signed-off-by: Klaus Aehlig <[email protected]>
    Reviewed-by: Petr Pudlak <[email protected]>

-----------------------------------------------------------------------

Summary of changes:


hooks/post-receive
-- 
Ganeti core

-- 

--- 
You received this message because you are subscribed to the Google Groups 
"ganeti-commits" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to