Harrie,
I’m glad to hear that you are involved in Phase II of the BSEAA. I have seen four of the reports. I saw the solicitation for Phase II but haven’t seen the work plan or who will be doing the work. It would be good to ground-truth the conclusions from the Phase I report, especially for those projects that were close to continuous operation. From what I understand a couple of the projects failed as much because of business and project management as technology issues. We see this in energy projects of all kinds, not just in gasification. The Baringa county project in Kenya was using an invasive species, Prosopis (Mesquite), as a fuel. They were using Laimet chippers, which make a very good fuel for downdraft gasifiers, but the wood was so hard that it was wearing out blades. They were to start out at 2 MWe but the largest gasifier system that I knew about from the supplier was 250 kWe. Were there unanticipated scaleup issues? It is difficult to do technology development in the bush. I also understand that there were issues with the delivery and integration of equipment. These are not problems that are unique to gasification, or Africa. What support is provided by the supplier? Successful gasification projects in South Asia and Southeast Asia usually have a third party technology supplier who makes sure the equipment is installed and operated correctly. Or, the systems are so cheap that you can afford to replace engines every two years. Efficiency is not the key metric. Gasifiers have a similar heat rate to small scale steam systems. What we need are systems that are simple, reliable, and maintainable. In the BSEAA study I would have like to have seen more in depth identification of steam or turbine systems that have been operating reliably, if there are any. I have to think that there are boiler and steam systems on tea plantations or other food processing plants. If they are using the heat and generating power, what makes them keep going? What lessons can be learned for gasification systems? The study should also clearly identify the expected operating conditions of the gasifiers. For example a gasifier that is made to be affordable (cheap) may only be designed to operate a few hundred hours per year, not 24/7 and 7,500 hours per year. Some gasifiers have been delivered expecting to operate 5-6 hours per day to replace the current use of diesel generators, only to find that people ran them 24 hours per day because biomass fuels can be cheap. Operating it beyond its expected annual duty is an invitation to failure. Supporting infrastructure. When we designed portable sawmills for use in Latin America, Africa, and Asia we often checked to see if the company or contractor that was buying the equipment had the right equipment and personnel to support the operation and maintenance of the equipment. A good diesel mechanic could usually learn or do what was needed. When we supply gasifiers to these same areas do we check to see what support equipment and personnel are on site to begin with and what their experience is? Our customers were usually logging companies that had good mechanical capabilities. Gasifiers often go into situations where operation and maintenance of process equipment is new to the owner. I have also seen gasifier projects fail when a donor organization fails to deliver the support equipment needed for maintenance. I am reminded of the World Bank Biomass Gasifier Monitoring Programme that Hubert Stassens did from 1986-1990 (WORLD BANK TECHNICAL PAPER NUMBER 296, 1995). You were probably involved in that. His engineers told us that many of the gasifiers only operated when Hubert’s team arrived for inspection. One in Mali had high reliability (55,000 hours) but had been heavily subsidized by support from China. Today we see hundreds of gasifiers in operation worldwide. Do we have any that can be suited to the fuels and conditions in Southern Africa? The major demand is for operation during frequent blackouts. Many thanks Tom On Fri, Oct 11, 2019 at 1:54 AM Harrie Knoef <[email protected]> wrote: > Hi Tom, > > The current status of gasification for power generation in Sub Saharan > Africa is very actual. In 2017, LTS International and E4Tech (both UK) > implemented Phase I of the Bioenergy for Sustainable Energy Access in > Africa (BSEAA) study. BSEAA is investigating opportunities and challenges > for the roll-out of bioenergy technology in Sub-Saharan Africa (SSA) and > supporting the development of innovative solutions. The study included six > Case Study Reports related to biomass gasification, none of them operated > successful. All of them are imported technologies from India, China, Canada > and Dominican Republic. > > I am involved in the Phase II study of BSEAA. Main task is to investigate > the barriers of implemented gasifiers *and* define enabling conditions > for successful adoption and expansion of small scale biomass gasification > technology in SSA countries. > > Hopefully I will be able to answer the question of Tom Miles during this > project. Any suggestion or comments regarding the BSEAA study are welcome ( > [email protected]). > > Thanks, > > Harrie Knoef > > *From:* [email protected] > *Sent:* Friday, October 11, 2019 12:11 AM > *To:* Discussion of biomass pyrolysis and gasification > <[email protected]> > *Subject:* Re: [Gasification] Gasification for Power Generation in > SubSaharan Africa > > We are selling gasification units that are patented downdraft units that > handle about 160lb. to 180lb. per hour. > They go out as singles, twins or as a Quad Pack. > We can fit four units in a 40ft. ISO Container. > > These units produce a fine, dry prilled (size of grains of rice) BioChar > which is sold on unprocessed at around US$1500 per ton or processed down > to 20 microns and then sold for around US$2850 per ton. > These units may be seen at University of Iowa. > They have only three main moving parts and pyrolysis takes place at very > high temperatures. > > In many cases we look at combining with a biodigester and make pellets > from the digestate which can be used as fuel for gasifier or as fertilizer, > we re-cycle the water as either "A" Grade agricultural water or we make it > potable with a simple proceedure. > > Stay safe. > Hugh. > > E. Hugh Pettman, Ph.D. > *BioPhysics Research Pte. Ltd.* > *BPR Soleco XYTECH Group* > www.biophysics-research.net > Telephone: +61 43 44 33 565 > > > -------- Original Message -------- > Subject: [Gasification] Gasification for Power Generation in SubSaharan > Africa > From: Tom Miles <[email protected]> > Date: Wed, October 09, 2019 2:32 am > To: [email protected] > > What is the current status of gasification for power generation in Sub > Saharan Africa? Where systems are operating in the 40-150 kWe range, > 150-500kWe, 500kWe-20 MWe? Are gasification systems participating in > current programs like Power Africa? What fuels are begin used? Are the > gasification systems reliable? > > Thanks > > Tom > ------------------------------ > _______________________________________________ > Gasification mailing list > > to Send a Message to the list, use the email address > [email protected] > > to UNSUBSCRIBE or Change your List Settings use the web page > > http://lists.bioenergylists.org/mailman/listinfo/gasification_lists.bioenergylists.org > > for more Gasifiers, News and Information see our web site: > http://gasifiers.bioenergylists.org/ > > ------------------------------ > _______________________________________________ > Gasification mailing list > > to Send a Message to the list, use the email address > [email protected] > > to UNSUBSCRIBE or Change your List Settings use the web page > > http://lists.bioenergylists.org/mailman/listinfo/gasification_lists.bioenergylists.org > > for more Gasifiers, News and Information see our web site: > http://gasifiers.bioenergylists.org/ > > _______________________________________________ > Gasification mailing list > > to Send a Message to the list, use the email address > [email protected] > > to UNSUBSCRIBE or Change your List Settings use the web page > > http://lists.bioenergylists.org/mailman/listinfo/gasification_lists.bioenergylists.org > > for more Gasifiers, News and Information see our web site: > http://gasifiers.bioenergylists.org/ > -- T R Miles Technical Consultants, Inc 1470 SW Woodward Way Portland, OR 97225 [email protected] www.trmiles.com
_______________________________________________ Gasification mailing list to Send a Message to the list, use the email address [email protected] to UNSUBSCRIBE or Change your List Settings use the web page http://lists.bioenergylists.org/mailman/listinfo/gasification_lists.bioenergylists.org for more Gasifiers, News and Information see our web site: http://gasifiers.bioenergylists.org/